My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-27-2022 PC MIN
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Minutes
>
2020 - 2029
>
2022
>
09-27-2022 PC MIN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 9:59:35 AM
Creation date
10/26/2022 9:53:15 AM
Metadata
Fields
Template:
City Government
type
PCM
date
9/27/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission <br />September 27, 2022 <br />Page 8 <br />Councilmember Beyer stated this question did come up during the public hearing on <br />September 19 and a number of people spoke, some positive about this project. They <br />then continued their public hearing to October 17. <br />Commissioner Mauren stated the August Planning Commission minutes indicated a <br />concern with condition 4 to add "detrimental stormwater system and the entirety of <br />the system." <br />It was the consensus to modify condition 4 to add "detrimental stormwater system <br />and the entirety of the system." <br />Moved by Commissioner Beise and seconded by Commissioner Mauren to <br />recommend approval of the request by the Briggs Companies for Parcel <br />ID#75-134-2305 for a Conditional Use Permit for a Planned Unit <br />Development (Jackson Hills Phase II) <br />1. A PUD Agreement shall be developed and signed by both parties prior <br />to issuance of a building permit. <br />2. Staff approval of landscape and lighting plans. <br />3. All utility meters shall be on an elevation of a building that does not <br />face a public right-of-way. <br />4. The developer shall provide evidence that any long-term dewatering <br />will not be detrimental to the stormwater system or the long-term <br />structural integrity of the proposed structures. <br />5. On -site soil mitigation must be monitored by a certified professional <br />and building permits will not be released until a final report has been <br />provided to the city. <br />6. Water service pipe over 2-1/2" in size shall be ductile iron. <br />7. Hydrants shall be spaced so that all portions of a building or residence <br />to be protected are within a 250-foot radius of a hydrant. Final review <br />will be made by the fire chief and city engineer. <br />8. There are at least eight existing water service stubs to this property; all <br />unused water services shall be shut off and disconnected at the main, <br />and the stop box shall be removed by a licensed plumber or licensed <br />sewer installer at the expense of the property owner. <br />Motion carried 6-0. <br />6. Council Liaison Update <br />Councilmember Beyer provided an update from previous City Council meetings. <br />7. Adjournment <br />The meeting was adjourned at 7:42 p.m. <br />IIIEIEI I <br />NATURE <br />
The URL can be used to link to this page
Your browser does not support the video tag.