My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1. PCSR 10-25-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2022
>
10-25-2022
>
7.1. PCSR 10-25-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2022 11:53:37 AM
Creation date
10/20/2022 9:17:56 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
10/25/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CAPSTONE <br />H O M E S <br />Bloomdahl Farm Concept — Project Narrative <br />Capstone Homes is presenting for consideration, a plan to develop 215 acres of land into a <br />mixed residential community consisting of detached single-family homes. The Bloomdahl Farm <br />is located just West of County Road 1 (Elk Lake Rd NW), along the North side of Ranch Road <br />NW. This property fully surrounds a 25+ acre city park and has beautiful natural features such <br />as rolling bluffs, wetland complexes, and opportunities for great walkability through a trail <br />network. Capstone is proposing to build single family homes using an estimate of 3 units per <br />buildable acre. <br />The City of Elk River adopted a Comprehensive Plan update in 2021. In the plan, the region of <br />Northwest Elk River that the Capstone project lies in, is guided for a Traditional Single -Family <br />Neighborhood. As guided by the Comp Plan, this type of neighborhood would consist of Single - <br />Family detached homes, townhomes, and duplexes. Capstone has a diverse product mix that <br />will meet this requirement and fill the moderately sized lots defined. Our intention is to <br />proceed with planning and engineering of the development area once the City of Elk River <br />approves a plan to provide water and sewer services to this region of the city. <br />Details associated with this Neighborhood development plan will be shared for review by city <br />staff, planning and council members as we begin the design process. As the city expands its <br />urban services to this region, it will allow Capstone to complete what will likely be a 7-8 phase <br />project, as market conditions allow. We look forward to working with the City of Elk River as we <br />move forward, bringing attainable homes to the marketplace. <br />Thank you <br />Matt Barker <br />Capstone Homes <br />14015 Sunfish Lake Blvd, Suite 400 <br />Ramsey, MN 55303 <br />Email: mbarker@capstonehomes-mn.com <br />Phone: 612-219-8041 <br />CAPSTONE HOMES, INC. <br />14015 SUNFISH LAKE BLVD, SUITE 400 1 RAMSEY, MN 55303 <br />0: 763-427-3090 1 F: 763-712-9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.