My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9.4 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
9.4 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 8:15:21 AM
Creation date
10/13/2022 3:26:44 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Plan <br />City of Elk River, Minnesota <br />Project ft STW-1 <br />Project Name Stormwater Projects <br />2023 2027 <br />Department <br />Storm Water <br />Contact <br />Storm Water Coordinator <br />Type <br />Maintenance <br />Useful Life <br />Unassigned <br />Category <br />Utilities <br />Description <br />Bi-annual pond cleaning, stormwater repairs, BMP inventory. <br />Z023 - Public shoreline improvements <br />Z025 - Elk Park Center basin and Zane Street basin <br />Storm water infrastructure projects combined with street projects are included on the pavement management CIP sheet.) <br />Justification <br />These projects include the testing, removal, and disposal of sediment deposits from our stormwater ponds. This is needed to assure the storm water <br />>ystem is functioning as designed and achieving the water quality standards of our NPDES permit. <br />the smaller stormwater repairs include minor pipe upsizing, culvert replacement, manhole and catch basin repairs and fixing of washout areas. <br />Expenditures 2023 2024 2025 2026 2027 Total <br />Construction/Maintenance 250,000 250,000 500,000 <br />Funding Sources <br />Storm Water <br />Total 250,000 250,000 500,000 <br />2023 2024 2025 2026 2027 Total <br />250,000 <br />Total 250,000 <br />250,000 <br />250,000 <br />500,000 <br />500,000 <br />2023-2027 CAPITAL IMPROVEMENT PLAN <br />
The URL can be used to link to this page
Your browser does not support the video tag.