My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.5 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
7.5 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 8:56:34 AM
Creation date
10/13/2022 3:18:32 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A final fundamental component of operational analyses is a study of vehicular queuing, or the line of <br />vehicles waiting to pass through an intersection. An intersection can operate with an acceptable Level of <br />Service, but if queues from the intersection extend back to block entrances to turn lanes or accesses to <br />adjacent land uses, unsafe operating conditions could result. In this report, the Industry Design Standard <br />95t'' percentile queue length is used. The 951'' Percentile Queue Length refers to that length of vehicle <br />queue that has only a five -percent probability of occurring during an analysis hour. <br />This study has utilized the industry current Synchro/SimTraffic software package (1 I' Edition) to analyze <br />the 2025 No -Build and Build conditions for the AM and PM peak hours at the site access intersection, <br />and at the Jackson Ave NW intersections with School St NW and with TH 10. It is noted the site access <br />intersection is stop controlled and the other intersections are traffic signal controlled. The results of the <br />capacity analysis are summarized in Tables 2. <br />Table 2 <br />Peak Hour Operations <br />LOS (Delay in sec) plus Vehicle Queuing in Feet <br />Intersection No. <br />2025 NB AM <br />2025 NB PM <br />2025 B AM <br />2025 B PM <br />Jackson Ave/TH10 <br />C (24.1) <br />E (64.8) <br />C (22.7) <br />E (61.1) <br />C (25.9) <br />E (61.1) EBL <br />C (21.9) <br />E (64.5) WBL <br />Worst Movement <br />95th Percentile Q <br />EBT-445' <br />WBL-480' <br />EBT-519' <br />WBT-461' <br />Jackson Ave/School St <br />B (11.7) <br />C (25.8) EBL <br />B (14.7) <br />C (24.4) WBL <br />B (12.6) <br />C (21.1) WB <br />B (15.1) <br />C (24.1) EBL <br />Worst Movement <br />95th Percentile Q <br />WBT-170' <br />EBL-246' <br />WBT-164' <br />EBL-270' <br />Jackson Ave/Site Access <br />Worst Movement <br />N/A <br />I <br />N/A <br />I <br />A (2.3) <br />A (7.7) EBL <br />EB-44' <br />A (3.1) <br />A (6.4) NBL <br />95th Percentile Q <br />E13-43' <br />The results shown in Table 2 indicate the overall operations of the study area intersections are providing <br />acceptable overall LOS with manageable vehicle queues for both the No -Build and Build conditions. <br />The roadway capacity conditions on Jackson Ave NW were also reviewed. In the vicinity of the site <br />Jackson Ave NW is generally a two-lane road with turn lanes at critical intersections which has a capacity <br />for approximately 15,000 trips per day. Currently Jackson Ave NW carries 5,200 trips per day or utilizes <br />approximately 35 percent of its capacity. The addition of the site traffic will add approximately 712 trips <br />per day in the southerly direction (greatest increase) increasing the daily traffic to approximately 5,912 <br />trips per day. The addition of the new trips will change the roadway capacity usage to 39 percent. There <br />is sufficient capacity for future growth on Jackson Ave NW. <br />Conclusion <br />The proposed Jackson Hills Apartments Phase 2-4 to the Jackson Ave NW corridor will not result in poor <br />operations or excessive queuing at the study area intersections. Please contact Vernon Swing at <br />vswingtraffickgmail.com or 612-968-4142 with any questions. <br />Attachments: Vicinity Map; Site Plan <br />8 I P a g e Jackson Hills Apartments — Phases 2-4, Elk River, MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.