My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.5 SR 10-17-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-17-2022
>
4.5 SR 10-17-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 8:12:58 AM
Creation date
10/13/2022 2:53:43 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6/302022 Exhibit B-1 Page 1 of 12 <br />SRF Consulting Group, Inc. Work Tasks and Person -Hour Estimates <br />Client: Sherburne County <br />Project: CSAH 33 Auburn Street to CSAH 13 (Twin Lakes Road) SRF Amendment No. 2 - Future Trail / Storm Sewer Design <br />Subconsultants: 13725.00 <br />TASK NO. SUMMARY OF TASKS Project Overview: <br />1.0 PROJECT MANAGEMENT Amendment No.2 <br />2.0 PRELIMINARY DESIGN <br />3.0 DESIGN Provide additional design services to shift previously approved alignment of CSAH 33 north approximately 10 feet to provide additional area along south <br />4.0 RIGHT OF WAYACQUISITION side for a future 10-foot trail. Update project to include a urban section with curb and gutter along south side from approximately 350 feet west of Auburn <br />5.0 BRIDGE DESIGN Street eastthru Quincy Street. Update preliminary layout, 30%Construction Plans, 30% Estimate, Fly-Thru Virtual Model for Public Open House and <br />6.0 CATTLE PASS DESIGN confirm design revisions at Trott Brook. Design will include constructing an urban section (with curb and gutter and storm sewer) from approximately 100 <br />7.0 TROTT BROOK HYDRAULIC DESIGN feet west of the planned cattle pass, under CSAH 33, east over Trott Brook and connect into the proposed curb and gutter atthe roundabout. <br />Re -model noise analysis based upon new alignment and profile east of Quincy Street. <br />Updates will be required for previous wetland delineation graphics and report, design tables and areas for the environmental document and additional <br />effort will be needed to facilitate final design of the corridor. <br />Revise stormwater design to incorporate a storm sewer system, potential pond ing/stormwater treatment and accommodations for future trail. <br />Task numbers correspond to original Work Scope task numbering. <br />Hours for Task 3.15 for Drainage Design reflect a 50/50 split with Sherburne County per cost share agreement. <br />13725 Amd_2_Rev3.alsx <br />SRF CONSULTING GROUP, INC. MINNEAPOLIS. MN <br />
The URL can be used to link to this page
Your browser does not support the video tag.