Laserfiche WebLink
Morton Drainage Study <br />City of Elk River <br />Figure 4: Storm Sewer Discharge Point Option 2 ® BOLTON <br />September 2022 & MEN K <br />Y <br />vv <br />_ W <br />a vv <br />�z <br />o w <br />POTENTIAL PONDING/WATER <br />V QUALITY LOCATION O N <br />AREA = 5,000 SQ FT <br />DEPTH = 3 FT :STORM DIVERSION <br />VOL = 11,000 CU FT <br />74 <br />BAILEY POINT NATURE PRESERVE <br />w <br />LEGEND <br />® EXISTING STORMWATER FACILITY <br />» EXISTING STORM SEWER <br />» PROPOSED STORM SEWER <br />EXISTING PONDING AREA <br />