My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1j EMRUSR 10-11-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2022
>
10-11-2022
>
6.1j EMRUSR 10-11-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2022 1:18:12 PM
Creation date
10/12/2022 1:18:12 PM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
10/11/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UTILITIES COMMISSION MEETING <br />TO: FROM: <br />ERMU Commission Dave Ninow – Water Superintendent <br />MEETING DATE: AGENDA ITEM NUMBER: <br />October 11, 20226.1j <br />SUBJECT: <br />Staff Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />Delivered eightnew water meters, sealed the meter,installed an encoder receiver <br />transmitter, and took curb stop ties. <br />Completed 15 BACTI/Total Chlorine Residual Samples <br />o All confirmed negative for Coliform Bacteria. <br />o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br /> Completed 21 routine fluoride samples <br />o All samples met MDH standards. <br />o Submitted MDH Fluoride Report <br /> Submitted Discharge Monitoring Report for the Diesel Generation Plant to the <br />Minnesota Pollution Control Agency. <br /> With combined efforts of staff in many departments at ERMU along with Robyn Hoerr <br />from Minnesota Rural Water Association and Terry Bovee Water Resource Planner, <br />there is continued progress on a draft of part two of the Well Head Protection Plan <br />revision. We are on track to meet the deadline for submitting the plan revision by <br />February 2023. <br /> The existing roofing for the Well 3 water treatment building has been removed and <br />replaced. This was part of the 2022 Capital Projects budget as the roof has reached the <br />end of its lifespan and had developed leaks. <br />th <br /> Water Department staff have been working with the contactor for Miske Meadows 8 <br />Additionon performing water main shutdowns for connection of new water main pipe <br />in that development. <br /> <br /> <br />ATTACHMENTS: <br /> September 2022 Pumping by Well <br />______________________________________________________________________________ <br />Page 1 of 1 <br />106 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.