The types and amount of equipment available following closure of the Landfill will be greatly reduced. <br />However, equipment is available on very short notice from a variety of local sources, including other <br />Waste Management facilities, local contractors, or rental facilities. <br />4.6 Amendment Of Contingency Plan <br />A modified contingency plan will be prepared and submitted to the MPCA whenever the facility permit is <br />amended; the design, construction, operation or maintenance of the facility change; or when a release at <br />or failure of the facility occurs which indicates revised procedures or costs are necessary. The Financial <br />Assurance plan will be revised whenever amendment of the Contingency Action Plan requires such a <br />change. <br />4.7 Estimated Costs For Contingency Actions <br />Cost estimates for contingency actions are summarized in Table 4D. The actions included in the <br />Contingency Action Plan cost estimates are considered to be occurrences above and beyond the routine <br />maintenance performed during site operation and post -closure care. The cost estimates include the <br />capital expenditure required to implement the contingency action, and where appropriate, the annual <br />operation and maintenance costs of the contingency action. Operating and maintenance costs for <br />subsequent years are included for the estimated period of operating time of the contingency action, or <br />through the 20-year post -closure period. Cost estimates for contingency actions will be revised as <br />necessary during the operating life of the facility, to account for inflation and other needed changes, such <br />as those which would be addressed in an amended plan. <br />BProject Number: 227705133 4.6 <br />