My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.2 SR 10-03-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-03-2022
>
6.2 SR 10-03-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 9:00:24 AM
Creation date
9/30/2022 12:50:28 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.8 Reporting <br />A report describing the inspection, conditions observed, corrective actions, maintenance activities and <br />monitoring activities and results is prepared and transmitted to the MPCA annually on or before March 1. <br />The corporate contact for the facility during the post -closure period will be: <br />Elk River Landfill <br />District Manager <br />22460 Hwy 169 NW <br />Elk River, MN 55330 <br />Phone: (763) 441-2464 <br />3.9 Ultimate Land Use <br />Waste Management will control uses of the site so there will not be disturbance to the final cap system, <br />liner, leachate collection system, landfill gas management system, or monitoring system unless approval <br />is obtained from the MPCA. If the property is sold, the deed will thoroughly document any required <br />restrictions. <br />If an alternative end use is planned, the proposal will be brought to the City, County and MPCA for <br />approval. <br />3.10 Amendment Of Post -Closure Plan <br />A modified Post -Closure Plan will be prepared and submitted to the MPCA for approval within 60 days of <br />any change or event that affects the Post -Closure Plan. This applies to, but is not limited to, any change <br />in the monitoring system or procedures. The Post -Closure Plan will be amended whenever the permit is <br />renewed. <br />3.11 Post -Closure Care Cost Estimate <br />Table 3 provides a summary of annual post -closure care costs. The long-term care cost projection for 20 <br />years, based on the annual post -closure costs, will be used for financial assurance calculations. <br />BProject Number: 227705133 3.4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.