My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 PRSR 10-05-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2021-2030
>
2022
>
10-05-2022
>
8.1 PRSR 10-05-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 11:37:16 AM
Creation date
9/30/2022 11:37:15 AM
Metadata
Fields
Template:
City Government
type
PRSR
date
10/5/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Elk River Youth Athletic Complex Shade Options <br />Below are 3 different options for shade to cover and help protect the existing playground at YAC and <br />corresponding budgets. These are fabric shades and are designed for providing UV protection and that is <br />their main purpose. Our fabric is not rated for projectiles such as baseballs and there is a possibility of <br />damage occurring. <br />To cover the existing equipment, the shade needs to clear 17’‐4’ in the center. <br />If the city chooses to move forward with a fabric shade structure, Flagship Recreation will to establish a <br />formal design and quote that will best fit within the space at YAC. <br /> <br /> <br />55x75 Super Hip: <br /> 6 Columns + 1 HDPE Tops / Approx. 4125 Sq.Ft – 16' Entry <br /> Budget Equipment: $81K ‐$88K <br /> Budget Install: $24K ‐ $31K <br /> Approx. Freight: $6400 <br /> Budget Total: $111,400 ‐ $125,400 <br /> IBC 2015, 105 MPH Wind, 5 PSF Snow. <br /> One piece of fabric with no gaps <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.