My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1 SR 10-03-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
10-03-2022
>
10.1 SR 10-03-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 8:59:25 AM
Creation date
9/30/2022 9:00:17 AM
Metadata
Fields
Template:
City Government
type
SR
date
10/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPINION ON PROBABLE COST <br />MORTON AVENUE DRAINAGE IMPROVEMENTS - OPTION 3 <br />CITY OF ELK RIVER, MN <br />i(DBOLTON <br />& MENK <br />Real People. Real Solutions. <br />Date: 09/22/2022 <br />OPTION 3 - ASSESSABLE: 319 MORTON AVENUE NW ACQUISITION, DOUBLE CATCH BASINS AT LOW POINT, AND SURGE POND <br />Al <br />MOBILIZATION <br />1 <br />LUMP SUM <br />$8,000.00 <br />$8,000.00 <br />A2 <br />TRAFFIC CONTROL <br />1 <br />LUMP SUM <br />$500.00 <br />$500.00 <br />A3 <br />319 MORTON AVE NW - COUNTY - 2022 VALUATION <br />1 <br />LUMP SUM <br />$219,000.00 <br />$219,000.00 <br />A4 <br />319 MORTON AVE NW - DEMO STRUCTURES <br />1 <br />LUMP SUM <br />$50,000.00 <br />$50,000.00 <br />A5 <br />REMOVE PIPE SEWER <br />10 <br />LIN FT <br />$8.00 <br />$80.00 <br />A6 <br />REMOVE CURB AND GUTTER <br />80 <br />LIN FT <br />$8.00 <br />$640.00 <br />A7 <br />REMOVE BITUMINOUS PAVEMENT <br />40 <br />SQYD <br />$5.00 <br />$200.00 <br />A9 <br />BITUMINOUS STREET PATCH <br />40 <br />SQYD <br />$50.00 <br />$2,000.00 <br />All <br />CONCRETE CURB AND GUTTER <br />80 <br />LIN FT <br />$20.00 <br />$1,600.00 <br />Al2 <br />CONNECT TO EXISTING STORM SEWER <br />2 <br />EACH <br />$1,000.00 <br />$2,000.00 <br />A13 <br />12" RC PIPE SEWER <br />10 <br />LIN FT <br />$50.00 <br />$500.00 <br />A14 <br />21" RC PIPE SEWER <br />60 <br />LIN FT <br />$65.00 <br />$3,900.00 <br />A15 <br />2'X3' CATCH BASIN <br />8 <br />LIN FT <br />$500.00 <br />$4,000.00 <br />A16 <br />CASTING ASSEMBLY <br />4 <br />EACH <br />$700.00 <br />$2,800.00 <br />A17 <br />319 MORTON AVE NW - BASIN EXCAVATION <br />525 <br />CU YD <br />$20.00 <br />$10,500.00 <br />A18 <br />TURF RESTORATION <br />0.2 <br />ACRE <br />$10,000.00 <br />$2,000.00 <br />SUBTOTAL CONSTRUCTION COST: $307,700.00 <br />10% CONTINGENCY: 530.800.00 <br />SUBTOTAL ENGINEERING & ADMINISTRATION: 561,000.00 <br />SUBTOTAL ASESSABLE PROJECT COST: $399,500.00 <br />OPTION 3 TOTAL ESTIMATED CONSTRUCTION COST: $404,100.00 <br />10%CONTINGENCY: $40,500.00 <br />TOTAL ENGINEERING & ADMINISTRATION : 580.100.00 <br />OPTION 3 TOTAL ESTIMATED PROJECT COST: $524,700.00 <br />Option 3 Cost Estimate <br />9/22/2022, 2:09 PM Bolton & Menk, Inc. Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.