Laserfiche WebLink
OPINION ON PROBABLE COST <br />MORTON AVENUE DRAINAGE IMPROVEMENTS - OPTION 2 <br />CITY OF ELK RIVER, MN <br />OPTION 2 -ASSESSABLE: DOUBLE CATCH BASINS, 200' MORTON AVE PIPE UPSIZE & SURGE POND <br />14�4 BOLTON <br />r�l & M E N K <br />Real People. Real Solutions. <br />Date: 09/22/2022 <br />Al <br />MOBILIZATION <br />1 <br />LUMP SUM $6,000.00 <br />$6,000.00 <br />A2 <br />TRAFFIC CONTROL <br />1 <br />LUMP SUM $2,000.00 <br />$2,000.00 <br />A3 <br />TREE CLEARING AND GRUBBING <br />4 <br />EACH $1,000.00 <br />$4,000.00 <br />A4 <br />REMOVE PIPE SEWER <br />195 <br />LIN FT $8.00 <br />$1,560.00 <br />A5 <br />REMOVE CURB AND GUTTER <br />235 <br />LIN FT $8.00 <br />$1,880.00 <br />A6 <br />REMOVE BITUMINOUS PAVEMENT <br />260 <br />SQ YD $5.00 <br />$1,300.00 <br />A7 <br />REMOVE CONCRETE PAVEMENT <br />50 <br />SQ YD $12.00 <br />$600.00 <br />A8 <br />BITUMINOUS STREET PATCH <br />260 <br />SQ YD $50.00 <br />$13,000.00 <br />A9 <br />6" CONCRETE DRIVEWAY PAVEMENT <br />90 <br />SQ YD $12.00 <br />$1,080.00 <br />A10 <br />CONCRETE CURB AND GUTTER <br />235 <br />LIN FT $20.00 <br />$4,700.00 <br />All <br />CONNECT TO EXISTING STORM SEWER <br />2 <br />EACH $1,000.00 <br />$2,000.00 <br />Al2 <br />12" RC PIPE SEWER <br />10 <br />LIN FT $50.00 <br />$500.00 <br />A13 <br />21" RC PIPE SEWER <br />210 <br />LIN FT $65.00 <br />$13,650.00 <br />A14 <br />STORM SEWER STRUCTURE <br />12 <br />LIN FT $500.00 <br />$6,000.00 <br />A15 <br />CASTING ASSEMBLY <br />3 <br />EACH $700.00 <br />$2,100.00 <br />A16 <br />TURF RESTORATION <br />0.1 <br />ACRE $15,000.00 <br />$1,500.00 <br />SUBTOTOAL CONSTRUCTION COST: <br />$61,900.00 <br />10% CONTINGENCY: <br />$6,200.00 <br />ENGINEERING & ADMINISTRATION: <br />$12,300.00 <br />SUBCATCHMENT TO LOW AREA ASSESSABLE PROJECT COST: <br />$80,400.00 <br />A17 <br />BAILEY POINT SURGE POND & PIPE BYPASS <br />1 <br />LUMP SUM $30,000.00 <br />$30,000.00 <br />10% CONTINGENCY: <br />$3,000.00 <br />ENGINEERING & ADMINISTRATION: <br />$6,000.00 <br />BAILY SURGE <br />POND & PIPE <br />BYPASS ASSESSABLE PROJECT COST: <br />S39.000.00 <br />TOTAL CONSTRUCTION COST: $188,300.00 <br />10% CONTINGENCY: $18,900.00 <br />ENGINEERING & ADMINISTRATION: $37,400.00 <br />OPTION 2 ESTIMATED TOTAL PROJECT COST: S244.600.00 <br />MORTON AVE DRAINAGE <br />9/22/2022, 2:06 PM Bolton & Menk, Inc. Page 2 of 2 <br />