Laserfiche WebLink
Garbage more than the designated volume -based per dwelling unit <br />will be subject to additional Collection Service charges as follows: <br />1) Contractor shall pick up excess Garbage in bags placed <br />outside of the resident's container only if the resident calls <br />Republic and pays at least 2-business days in advance of <br />their pickup day. Contractor shall charge residents directly <br />a fee of $3.25 for each such bag picked up. Contractor shall <br />be responsible for advising City of addresses which <br />consistently have excess amounts of Garbage and City will <br />determine whether to increase the container size for that <br />address. <br />2) Collection Service for Bulky Items and large items must <br />have prior arrangements made between the Contractor and <br />resident for collection. The prices to be charged to residents <br />for these Collection Services shall be as set forth by the <br />Contractor. These charges will be billed directly from the <br />Contractor to the resident. <br />3) Excess Recycling Collection: The Contractor shall collect excess <br />recycling provided that it is stored in paper bags, or, in the case <br />of cardboard, it is flattened and bundled neatly with twine, is no <br />larger than 3 foot by 3 foot bundles and placed adjacent to the <br />recycling cart. <br />j. Garbage and recycling containers will be dropped off at new <br />accounts by the Contractor within three (3) business days of <br />notification by the City. Such notification must be in email form. <br />k. The Contractor shall deliver all Garbage it collects under this <br />Agreement to the Elk River Landfill (ERL), unless otherwise <br />directed by the City, Sherburne County or ERL. If a Contractor is <br />directed by City to a Facility other than the ERL, the Contractor <br />shall be credited $1.00 per mile by the City for the round-trip <br />mileage between the ERL and the back-up Facility. For sites other <br />than ERL, Republic will bill the City of Elk River. <br />1. Unless otherwise directed by City, Contractor shall, upon delivery <br />of Garbage to the ERL or other designated Facility, give the <br />Facility operator a load report on a form acceptable to Sherburne <br />County that provides information concerning the load as may be <br />required by the County. The Contractor shall also provide the City, <br />on a monthly basis, with receipts showing the weight of Garbage <br />delivered to the ERL under this Agreement, or any other Facility to <br />which Garbage collected under this Agreement is delivered. <br />221122v2 <br />