My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.1. PCSR 09-27-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2022
>
09-27-2022
>
5.1. PCSR 09-27-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2022 12:28:41 PM
Creation date
9/23/2022 12:28:13 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/27/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />The Elk River Vision <br />A welcoming community with revolutionary and spirited resourcefulness, exceptional <br />service, and community engagement that encourages and inspires prosperity <br /> Request for Action <br /> <br /> <br /> <br /> <br />To <br />Planning Commission <br />Item Number <br />4.4 <br />Agenda Section <br />Public Hearings <br />Meeting Date <br />August 23, 2022 <br />Prepared by <br />Zack Carlton, Community Development Director <br />Item Description <br />Briggs Companies – Parcel ID# 75-134-2305 <br /> Conditional Use Permit for a Planned Unit <br />Development (Jackson Hills Phase II), Case No. <br />CU 22-17 <br />Reviewed by <br />Chris Leeseberg, Senior Planner <br />Reviewed by <br /> <br /> <br />Action Requested <br />Recommend, by motion, approval of the Conditional Use Permit <br />establishing a residential Planned Unit Development (PUD), with <br />the following conditions: <br />1. A PUD Agreement shall be developed and signed by both <br />parties prior to issuance of a building permit. <br />2. Staff approval of landscape and lighting plans. <br />3. All utility meters shall be on an elevation of a building that <br />does not face a public right-of-way. <br />4. The developer shall provide evidence that any long-term <br />dewatering will not be detrimental to the stormwater <br />system. <br />5. On-site soil mitigation must be monitored by a certified <br />professional and building permits will not be released until <br />a final report has been provided to the city. <br />6. Water service pipe over 2-1/2” in size shall be ductile <br />iron. <br />7. Hydrants shall be spaced so that all portions of a building <br />or residence to be protected are within a 250-foot radius <br />of a hydrant. Final review will be made by the Fire Chief <br />and City Engineer. <br />8. There are at least 8 existing water service stubs to this <br />property; all unused water services shall be shut off and <br />disconnected at the main, and the stop box shall be removed by a licensed plumber or licensed <br />sewer installer at the expense of the property owner. <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.