My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.3. PCSR 09-27-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2022
>
09-27-2022
>
4.3. PCSR 09-27-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2022 2:05:07 PM
Creation date
9/22/2022 2:02:11 PM
Metadata
Fields
Template:
City Government
type
PCSR
date
9/27/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CUP - Description of project <br />I am simply looking to park some equipment on my property in an area that already has existing <br />gravel as well as a tree buffer on a 3ft landscape mound as required for outdoor parking. The <br />equipment would consist of trucks, trailers, lawn mowers, skidsteers, etc. The equipment is out <br />of sight of all neighboring properties and would not have excessive weeds growing around it etc. <br />with being parked on gravel. A majority of the equipment is also typically gone during day time <br />hours and would only be stored at the property overnight when it is not at customers houses. <br />We would be temporarily operating the equipment during the hours of 7:00am - 7:00pm. We <br />would Not be operating the equipment for extended periods of time, but rather just starting it <br />briefly on site to load it / leave the property as all of our work is completed at clients’ homes as <br />we do lawn care & landscape work. <br />We would typically only have a few employees at the property throughout the day as all of the <br />others leave to go to customers homes to complete work during the day. Our company currently <br />has a total of 10 - 20 employees throughout the season, but not all employees would be coming <br />to this property as many often meet at the job sites and do not need to come to where some of <br />our equipment would be parked overnight. <br />The property currently does not have any parking stalls and would not need to add any <br />additional parking stalls as we would not have many employees or customers parking at the <br />property. Any employee vehicles parked at the property could be parked on the gravel in the <br />buffer area in the place of where the piece of equipment being removed for the day was parked. <br />Yes, there is an existing landscape berm and tree coverage on site to provide screening. In <br />addition the place where equipment would be stored is not in any direct sight of any neighboring <br />properties. <br />We are not looking to build any buildings, again we are solely looking to park some equipment <br />on an area that is already gravel and has a buffer from the neighbors. <br />We do Not need to install any signs, there would be No signage on site. <br />The only thing we are looking to do is outdoor storage of some of our equipment in an area with <br />existing gravel and tree screenage on a landscape berm out of sight of all neighboring <br />properties. The area we are looking to store equipment is approx. 190 feet x 250 feet.
The URL can be used to link to this page
Your browser does not support the video tag.