Laserfiche WebLink
Chapter 04 � Master Plan <br />Trail Typology: Hwy 169 motorized <br />OVERVIEW <br />This typology utilizes the 100' wide railroad corridor along the west side of highway 169. The existing <br />railroad bed would be paved as a 10' wide bicycle and pedestrian trail, with a dedicated motorized use <br />trail constructed adjacent to the main trail. The two trails would be separated by a grade change, and <br />vegetated buffer and the motorized use trail would be limited to a 25-mph speed limit. This typology <br />AD�fTIflN pf Mf]TORREDTRAIL <br />REQVIRES W E7WN� MIYIGATIflN ,� ' <br />ANp VEG�TATIpN REMqVAL -' <br />.i �, <br />�'. <br />p ��� -E � <br />'� ` 8 <br />� �:�.��. <br />���' , ' <br />� <br />� i ,�- ,� <br />I;' ,''.. I L I-; i=� �. CJ F; L�d`i <br />PROPOSED CONDITION: OPTION 1 <br />72 Great Northern Trail Master Plan � August 2022 <br />"�,�. <br />�. <br />.� <br />C� 9 -. �. �'�,t <br />� <br />� . �, <br />�� �.�` <br />' �'"�°`�`�. -_ = �, <br />.� . <br />. <br />�' ,r' � . _ <br />� � -- <br />EXISTING CONDITION <br />�-.._ . <br />