My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.1e ERMUSR 11-14-2017
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2017
>
11-14-2017
>
6.1e ERMUSR 11-14-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2022 10:32:29 AM
Creation date
9/12/2022 10:32:29 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
11/14/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Elk River <br /> Municipal Utilities UTILITIES COMMISSION MEETING <br /> TO: FROM: <br /> ERMU Commission Eric Volk—Water Superintendent <br /> MEETING DATE: AGENDA ITEM NUMBER: <br /> November 14, 2017 6.1e <br /> SUBJECT: <br /> Staff Update <br /> ACTION REQUESTED: <br /> None <br /> DISCUSSION: <br /> • Delivered ten new water meters. <br /> • Sealed the water meter, and took curb stop ties from six water services. <br /> • Completed 25 BACTI/Total Chlorine Residual Samples <br /> o All confirmed negative for Coliform Bacteria. <br /> o Bacteriological/Disinfectant Residual Monthly Report submitted to the MDH <br /> • Completed 20 routine fluoride samples <br /> o All samples met MDH standards <br /> o Submitted MDH Fluoride Report <br /> • Submitted MPCA Discharge Monitoring Report(DMR) for the Diesel Generation Plant. <br /> • The water operators have been out locating the distribution system. As the system is <br /> located they will work with the mapping department to ensure our maps are accurate. The <br /> mapping department will be printing new map books this winter. <br /> • The WTP #7 expansion is now complete. Final payment should be made shortly. <br /> • Horwitz Nsi installed a new 10"meter at WTP#6. The installation of the new meter <br /> required some wiring and chemical feed changes, which the operators completed. <br /> • The Water Department and Streets Department completed the annual drawdown of Lake <br /> Orono to perform the inspection of the Elk River Dam. It's important to note that Elk <br /> River received 3.5 inches of rain the weekend before the drawdown which resulted in <br /> record flows for this time of the year. Attached is a chart showing the flows at 1,670 ft3/s <br /> (12,525 gps). The estimated flow over the dam was 1,804 ft3/s (13,527 gps). Despite the <br /> high flows, we were able to inspect a majority of the dam. However, due to the <br /> Mississippi River being backed up into the Elk River,the inspection of the roller bucket <br /> and the downstream riprap was not able to be performed. In previous years it has taken <br /> about 24 hours for the lake to refill to its normal level; whereas this year it took about <br /> four hours. <br /> • The Water Department connected the new 6"water main along Highway 10. This is the <br /> first section of water main to be relocated. The second section of water main to be <br /> relocated will be completed in accordance with the MnDOT contract. The relocation will <br /> take place in the spring of 2018. <br /> Page 1 of 2 <br /> 91 <br />
The URL can be used to link to this page
Your browser does not support the video tag.