Laserfiche WebLink
Elk River Municipal Utilities Business Plan/Budget <br />2023 Electric Department Capital Budget <br />Capital Construction Projects <br />Cost Description <br />250,000$         Highway 169 redefine Reserves <br />75,000$           199th rebuild <br />100,000$         Rebuild Sandpiper Estates <br />100,000$         Waco Business Center Dr Recon <br />100,000$         Cty Rd 44 Rebuild <br />100,000$         Cty Rd 33 <br />100,000$         Rebuild: Parish Ave <br />100,000$         Rebuild: 200th, 201st, Rawlings, Pascal <br />75,000$           Otsego Street Lights <br />Subtotal 1,000,000$      *Projects listed in order of priority <br />Capital Construction Substations <br />Cost Description <br />150,000$         East Design <br />500,000$         Otsego Transformer Replacement Reserves <br />30,000$           Station 14‐3 Relay Panel Replacement <br />6,000$              Station 14‐4 Recloser Controller Replacement <br />51,000$           West Bank #1 Relay Panel Replacement, Recloser Controller and Tank Replacement <br />45,000$           West Bank #2 Relay Panel Replacement and Recloser Tank Replacement <br />Subtotal 782,000$          <br />Capital Construction Feeders <br />Cost Description <br />300,000$         New Feeder to tie Sub14‐4 to Otsego Sub <br />100,000$         County Rd 35 Feeder to Waco <br />250,000$         Rebuild Feeder 46 Substation to Hwy 10 <br />700,000$         Data Center Feeder <br />750,000$         Additional Feeders Reserves <br />Subtotal 2,100,000$       <br />Capital Construction System <br />Cost Description <br />510,000$         Transformers and Meters <br />2,500,000$      AMI Reserves <br />350,000$         New Development Distribution Installation <br />50,000$           Street Lighting  <br />75,000$           Ongoing OH Equip Replacement (Poles, Switches, Cut‐Outs) <br />150,000$         Ongoing URD Equip Replacement (Switches, J‐Boxes, Fuse Pads) <br />50,000$           Fault Indicators Replacements <br />Subtotal 3,685,000$       <br />Capital Equipment Needs <br />Cost Description <br />250,000$         Replace Bucket Truck Vehicle #4 <br />110,000$         Replace Vactron Vehicle #50 <br />20,000$           Trailer <br />55,000$           Replace Truck Vehicle #20 <br />10,000$           Ez Spot <br />167,620$         Electric share of Administration <br />309,625$         Electric Share of Technical Services  <br />Subtotal 922,245$          <br />Capital Facilities & Misc Needs <br />Cost Description <br />30,000$           Vactron clean out west sub <br />924,190$         Territory Acquisition ‐ Loss of Revenue Pmt (2015 Contract ‐ Area 1&2, 3&4, 5&6, 7&8) Reserves <br />Subtotal 954,190$          <br />Total Capital 9,443,435$       <br />Electric Noteworthy Non‐Recurring Expenses <br />Cost Description <br />21,200$           Computers, iPads, Software, Accessories <br />6,000$              Paint Trailer <br />10,000$           Paint Transformers/Switchgear <br />10,000$           Tools <br />15,000$           Station 14‐3 Contractor Testing and Inspections <br />14,000$           Electric share of Administration <br />18,170$           Electric share of Technical Services  <br />Total 94,370$            <br />87