My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8.1 PRSR 09-14-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2021-2030
>
2022
>
09-14-2022
>
8.1 PRSR 09-14-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 2:50:00 PM
Creation date
9/9/2022 2:48:20 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
9/14/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/30/2022Preliminary BudgetPossible AdditionsPossible ReductionsQTYNotesPlay Equipment Design ‐ ElkRiver_LionsPark 080222 OPT186,819.60List Price of Equipment State Contract Discount (6,945.57)8%State Contract #119795Sales Tax ‐ if applicable 0.00Equipment Installation (Man Hours & Concrete for Footings)14,596.42Full professional installation by Landscape Structures Certified Installers *Estimated add for install of additional componentsDelivery of Play equipment800.00estimated / final quote will be providedPer Diem0.00estimated / final quote will be providedMobilization500.00Dumpster(s) ‐ 30 Yard1,050.00(1,050.00)Disposal of packaging material *Possible deduct if owner provides dumpsterSite work*Removal of existing equipment and surfacing by ownerExcavation, Hauling & Disposal (new container) 0.00Demo, Excavation, Hauling & Disposal (existing container) 0.00Removal of existing equipment and surfacingSpecial Equipment (Lull, Lift, Compactor, etc.)0.00Border Options*Remain within existing boarderConcrete Border Straight (LF)0.000Standard 6" W x 12" D w/ rebarConcrete Boarder Curved (LF)0.000Standard 6" W x 12" D w/ rebarPlastic Timbers & Ramp0.00Retaining Wall0.00Concrete Flatwork Concrete Flatwork (Sq. Ft.)0.000Thickened Edge (LF)0.000Thickened edge used when installing a sidewalk adjacent to playground container. Prevents stone base from washing out.Asphalt0.00Concrete Base / mound or sloped surface (2" skim coat)0.00Subgrade PreparationDrainage Aggregate ‐ Pea Rock or Concrete Sand (Tons)0.000Drainage Layer (3" depth) ‐ Recommended with EWF installations Compacted Aggregate Base (Recycled Concrete or Class 5) (Tons)0.000Class 5 aggregate or recycled concrete (w/fines), delivery and installation . 4" ‐ 6" compacted depth. Required for PIP & Synthetic Turf installations Drain Tile (LF)0.000Perforated Corrugated Drain Tile with SockSurfacing Engineered Wood Fiber (EWF)EWF ‐ Playground Safety Surfacing (CY)3,225.062040 sfIPEMA Certified Playground Surfacing ‐ Meets the standards of ASTM, ADA & CPSCGeoTextile Fabric (Sq. Ft.)0.000Price includes installationRubber Wear Mats0.000Rubber Wear Mat. Includes wear pad and deliverySurfacing Poured In Place (PIP) & Synthetic TurfPlayBound Poured In Place by Surface America (Sq. Ft.)0.000Budget estimate assumes use of Aliphatic Binder (10 year warranty) and 50/50 mix of standard colors & black. Premium Colors have an additional . Synthetic Turf (Sq. Ft.)0.000Painting0.000Security Gurard 0.00Site Restoration (Sq.Ft.)0.000Top soil, seed and blanketPayment & Performance Bonds 0.00Budget Total Total AdditionsTotal ReductionsTotal w/ Additions & Reductions100,045.500.00 (1,050.00)98,995.51Michael HeckerPRELIMINARY BUDGET ‐ THIS IS AN ESTIMATE & NOT A FORMAL QUOTECity of Elk River13065 Orono Pkwy NWElk River, MN 55330
The URL can be used to link to this page
Your browser does not support the video tag.