My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.1 PRSR 09-14-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Parks and Recreation Commission
>
P&R Packets
>
2021-2030
>
2022
>
09-14-2022
>
7.1 PRSR 09-14-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 2:47:55 PM
Creation date
9/9/2022 2:47:07 PM
Metadata
Fields
Template:
City Government
type
PRSR
date
9/14/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Great Northern Trail Master Plan | August 202242 <br />Chapter 03 | Public Input + Participation <br />TrailheadsTrailheads <br />FIGURE 20: PROPOSED CONDITION FIGURE 20: PROPOSED CONDITION <br />Trailhead 1: Zimmerman <br />Shade Structures, Trail Kiosk, Bike Parking, Drinking Fountain, Porta Potty with screen, Electrical Vehicle Charging Stations and Stormwater Areas. <br />~35 engaged <br />Trailhead 2: North Princeton <br />Warming Hut and Restrooms, Fire Pits, Electric Bike Charging Stations, Electrical Vehicle Charging Stations, Fencing, Trail Kiosk, and Trailer Parking <br />~35 engaged <br /> FEEDBACK SURVEYMAYBE <br />MAYBE <br />YES YES <br />NO NO <br />“This looks to be a great size and amount of <br />amenities to put in place” <br />“Well conceived and very useful link to the <br />Zimmerman Park” <br />“Love the options of trail heads with bathrooms” <br />“The trailer parking is a must here and I love the <br />warming hut component” <br />“Could be very beneficial to Long Siding” <br />“The trailer parking is a must here and I love the <br />warming hut component”
The URL can be used to link to this page
Your browser does not support the video tag.