Laserfiche WebLink
Great Northern Trail Master Plan | August 202242 <br />Chapter 03 | Public Input + Participation <br />TrailheadsTrailheads <br />FIGURE 20: PROPOSED CONDITION FIGURE 20: PROPOSED CONDITION <br />Trailhead 1: Zimmerman <br />Shade Structures, Trail Kiosk, Bike Parking, Drinking Fountain, Porta Potty with screen, Electrical Vehicle Charging Stations and Stormwater Areas. <br />~35 engaged <br />Trailhead 2: North Princeton <br />Warming Hut and Restrooms, Fire Pits, Electric Bike Charging Stations, Electrical Vehicle Charging Stations, Fencing, Trail Kiosk, and Trailer Parking <br />~35 engaged <br /> FEEDBACK SURVEYMAYBE <br />MAYBE <br />YES YES <br />NO NO <br />“This looks to be a great size and amount of <br />amenities to put in place” <br />“Well conceived and very useful link to the <br />Zimmerman Park” <br />“Love the options of trail heads with bathrooms” <br />“The trailer parking is a must here and I love the <br />warming hut component” <br />“Could be very beneficial to Long Siding” <br />“The trailer parking is a must here and I love the <br />warming hut component”