<br />8. <br /> <br />The City shall be notified by the Permittee immediately upon the occurrence <br />of any explosion, fire, or other emergency at the Facility; upon the discovery, <br />release or spill of hazardous or dangerous materials, as defmed in the City of <br />Elk River Solid Waste Ordinance, at the Facility; and of any violations of the <br />conditions of the Permit, Air Emission Facility Permit No. 1410000-003 or <br />Permit for a Waste Processing Facility and System, No. SW-305. The <br />specific requirements for how, when and who to notify at the City shall be set <br />forth in a separate letter from City Staff to Permittee. This letter may be <br />revised or supplemented by City staff from time to time as necessary to <br />address the City's needs for notification. <br /> <br />. <br /> <br />9. This Permit authorizes an average annual throughput of one thousand five <br />hundred twenty-six (1,526) tons per day ofMSW. <br /> <br />10. All MSW, RDF, Reject or Residue-hauling truck traffic entering or exiting the <br />Processing Facility or the Bum Facility shall use only those highways and <br />streets as allowed in writing by the City Council, avoiding the use of Main <br />Street and residential streets, if at all possible. Truck traffic originating in the <br />City may use other public streets. <br /> <br />11. <br /> <br />The Facility may operate twenty-four (24) hours a day. However, the City <br />reserves the right to restrict the hours of operation of the Facility to normal <br />business hours if noise emanating from the Facility to surrounding residential <br />properties is unacceptable. Receiving and transporting MSW and rejects at <br />the Processing Facility may take place twenty-four (24) hours a day, Monday <br />through Saturday. However, the City reserves the right to restrict further the <br />hours of receiving and transporting MSW at the processing facility if <br />necessary to protect the public health, safety, and welfare. RDF may be <br />transported twenty-four (24) hours a day. At the Processing Facility, all truck <br />and Processing Facility wash water shall be diverted and captured in a <br />retention tank so that it does not enter the groundwater system. <br /> <br />. <br /> <br />12. The processing Facility shall be enclosed by a minimum six-foot and no more <br />that eight-foot high chain link fence. <br /> <br />13. The Processing Facility shall undertake no processing ofMSW until all <br />appropriate items in the Permit and the building permit are completed and <br />finally inspected by the City of Elk River Building and Environmental. <br />Administrator and a written certificate of occupancy has been issued. <br /> <br />14. <br /> <br />Permittee shall test Testing as requested by State agencies of storm water run- <br />off captured in the on-site retention/detention pond, and shall provide v,Titten <br />reports on these test results to the City, as provided in the rain ',vater run off <br />sampling plan submitted by Permittee. If the required tests indicate 'linter <br />quality problems in raimvater: run off, Permittee shall submit to the City for <br />approyal a plan for addressing such problems and shall implement such <br /> <br />. <br /> <br />s:\b&e \stever\nrg\nrgcup.doc <br /> <br />4 <br />