Laserfiche WebLink
<br />Permitee's February 1, 1993, application for renewal ofthe Conditional Use <br />Permit; in Permitee's November 8, 1995, application for renewal of the <br />Conditional Use Permit; in Permitee's November 2, 1999; and in Permittee's <br />December 22,2004, application for renewal of the Conditional Use Permit; all <br />of which have been provided to the City by the Permittee in support of the <br />application for this Amended Conditional Use Permit and collectively <br />describe the Facility authorized by the Permit. The Facility consists of three <br />(3) integrated components located in the City: (1) A facility for receiving <br />municipal solid waste and processing it into refuse-derived fuel (Processing <br />Facility); (2) A facility for the incineration of refuse derived fuel (burn <br />facility); and (3) The movement of vehicles transporting municipal solid waste <br />(MSW), refuse-derived fuel (RDF), rejected municipal solid waste (Rejects), <br />and incineratieHated RDF ash residue (Residue). So long as RDF is <br />incinerated in the City, the conditions of this Permit which relate to the Burn <br />Facility and Residue shall be in full force and effect. Construction or <br />operation in violation of any of the material statements of fact, factual <br />information, or representations in the referenced documents shall be deemed <br />to be a violation of the Permit and all such documents are considered to be <br />and are hereby made a part of the Permit. <br /> <br />. <br /> <br />2. <br /> <br />Building construction, driveways, parking, grading, utilities, surface water <br />management, erosion control, landscaping, fencing, and screening for the <br />Processing Facility shall be provided substantially in accordance with the <br />plans submitted by Northern States Power Company with the original <br />application of a conditional use permit and the November 28, 1989 application <br />for renewal of conditional use permit, which are herby made a part of this <br />Permit. In addition, these plans shall be further revised to provide a hard <br />surfaced, diked area to drop hot loads of processed RDF so that they can be <br />put out and fire suppression water retained; and to further provide that all <br />areas on the facility site are either hard surfaced parking and drive areas, pea <br />rock or asphalt shavings for equipment storage, or landscaped areas with <br />grass. There shall be no gravel or dirt areas on the facility site. The revised <br />plans shall be submitted by December 31, 1990, and all improvements <br />installed by September 30, 1991. <br /> <br />. <br /> <br />3. All utility and street construction plans and specifications as presented by <br />Northern States Power Company for the Facility and servicing streets must be <br />prepared by a Registered Civil Engineer in accordance with directions of and <br />approved by the City Engineer. <br /> <br />4. All building plans and specifications must be approved by the City Building <br />Inspector and Fire Chief. <br /> <br />5. <br /> <br />Approval of driveway entrances, if needed, on State and County highways <br />shall be secured from the appropriate agencies and filed with the City <br />Building and Environmental Administrator prior to issuance of any building <br /> <br />. <br /> <br />s:\b&e \stever\nrg\nrgcup.doc <br /> <br />2 <br />