Laserfiche WebLink
<br />. <br /> <br />2. <br /> <br />Item 2, page 2 - NRG proposes, "There shall be no gravel or dirt areas on <br />the facility site" be deleted. Staff is in agreement with this change. <br />Item 14, page 4 - NRG proposes "Permittee shall test storm water run-off <br />captured in the on-site retention/detention pond, and shall provide written <br />reports on these test results to the City, as provided in the rain water run-off <br />sampling plan submitted by Permittee. If the required tests indicate water <br />quality problems in rainwater run-off, Permittee shall submit to the City for <br />approval a plan for addressing such problems and shall implement such <br />solutions as are required by City." be replaced by "Testing as requested by <br />State agencies of storm water run-off captured in the on-site <br />retention/detention pond". Staff recommends adding "Permittee shall <br />provide City evidence of storm water NPDES permit coverage for <br />industrial activities and a copy of the permittee's Storm Water <br />Pollution Prevention Plan." This has become a standard requirement <br />for projects in the City that impact over I acre. <br /> <br />. <br /> <br />. <br /> <br />3. <br /> <br />NRG's Solid Waste Facility License <br /> <br />I. Item 10, page 5 - NRG proposes to add "or (3) 16Sh Avenue to Highway 10 to <br />Main Street to Highway 169 into the GRE facility; or (4) from the facility via 165th <br />Avenue to Highway 10 to 17/'t Avenue to Twin Lakes Road to Main Street to <br />Highway 169 into the GRE Facility." Staff is in agreement with this <br />change. <br /> <br />2. Item 12, page 6 - NRG proposes to delete "on a temporary basis" and "Open <br />top trailers shall be allowed for public drop off of solid waste, but shall be covered <br />at all times when the public drop off is not open." Staff is in agreement with <br />this change. <br /> <br />3. Item 13, page 6 - NRG proposes "Permittee shall test storm water run-off <br />captured in the on-site retention/detention pond, and shall provide written reports <br />on these test results to the City, as provided in the rain water run-off sampling plan <br />submitted by Permittee. If the required tests indicate water quality problems in <br />rainwater run-off, Permittee shall submit to the City for approval a plan for <br />addressing such problems and shall implement such solutions as are required by <br />City." be replaced by "Testing as requested by State agencies of storm water run- <br />off captured in the on-site retention/detention pond". Staff recommends <br />adding "Permittee shall provide City evidence of storm water NPDES <br />permit coverage for industrial activities and a copy of the permittee's <br />Storm Water Pollution Prevention Plan." This has become a standard <br />requirement for projects in the City that impact over I acre. <br />