Laserfiche WebLink
Request for Action <br />To Item Number <br />Ma Tor and CinT Council 4.6 <br />Agenda Section Meeting Date Prepared by <br />Consent August 15, 2022 Matt Stevens Chief OpeYatoY <br />Item Description Reviewed by <br />High`va�T 169 Force Main Valve Installation ustin Femrite, Chief En ineer <br />Reviewed by <br />Cal Pormer, Cit�T Administrator <br />Action Requested <br />Approve, byT motion, attached quotation for installing a valve on the High`vayT 169 force main. <br />Background/Discussion <br />As a follow-up to the June 16`i' wastewater callout for water coming out of the valve pit at the Highway 169 lift <br />station, we have identified the need to install valves on the three force mains that feed the wastewater treatment <br />facilityT. <br />The quote is foY the first of the three valves that are needed. The Highwayr169 foYce main is a priorityr since we will <br />need to isolate this line in 2023 for planned modifications as paYt of the 969 Bedefine pYoject. Due to the laYge pipe <br />diameter, there is on1yT one manufacturer of the valve required and veryT limited companies who can complete the <br />installation. Brenteson Companies will act as our general contractor for the excavation with the support of <br />Municipal Pipe Services who will cut in the new valve. <br />The valves on the other t�vo foYce mains feeding the plant will be added to the CIP to complete next year. <br />Financial Impact <br />The cost of the valve installation is $50,930.00 and will come from our Trunk UtilityT Fund. <br />Mission/Policy/Goal <br />Meet changing needs - Agile <br />Attachments <br />■ Brenteson Quotation <br />The Elk River Vision <br />A 2a�elcolning co�nlnunity 2a�ith T evolutiona� y and spizzted T esou� cefulness, exceptional <br />se�vice, and coln�nunity engagelnent that encou�ages and ins�iz•es pTo�pe�zty. <br />rowEREo ar <br />�I'1 ���� <br />Up�iited.• August 2020 <br />