Laserfiche WebLink
�� Terra <br />BCONTRACTOR <br />n its <br />General Requirements <br />Contingency <br />Fee <br />CONTINUATION SHEET <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAVMENT, containing <br />Contractor's signed certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />ITEM <br />NO. <br />COST <br />CODE <br />i-000z <br />1-0110 <br />1-0120 <br />1-0150 <br />2-2070 <br />2-2070 <br />2-2070 <br />2-2070 <br />2-2070 <br />2-2070 <br />2-2070 <br />2-2070 <br />2-2070 <br />2-2070 <br />2-2070 <br />2-2070 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />33300 <br />BID <br />PACK <br />NO. <br />DESCRIPTION OF WORK <br />Preconstruction <br />Bonds & Insurance <br />Building Permit/SAC/WAC/SWPPP <br />CM Geneal Requirements <br />CM Contingency <br />CM Fee <br />2A Selective Demolition <br />2A CO#1 PR#2R Add demo <br />2A CO#2 RFI#5 <br />2A CO#3 RFI#17 <br />2A CO#4 RFI#21 <br />2A CO#5 RFI#36 <br />2A CO#6 RFI#78 Added Brick Demo <br />2A CO#7BackCharge(FixDamagedAirand5torm5ewer) <br />2A CO#8 Added Demo at Brick Ledge <br />2A CO#9 RFI#21 <br />2A CO#10 RFI#150 EOC Demo Carpet <br />2A CO#11 PR#19 Demo for Fire Office Remodel-VOID <br />3A GeneralConditions <br />3A Bonds&Insurance <br />3A Rebar&Accessories <br />3A Area A Found <br />3A Area A Found <br />3A Area A 50G <br />3A Area A 50G <br />3A AreaATop5labs <br />3A AreaATop5labs <br />3A Area C Found <br />3A Area C Found <br />3A Area C 50G <br />3A Area C 50G <br />3A ExteriorConcrete <br />3A ExteriorConcrete <br />32D GeneralConditions <br />32D Bond&Insuance <br />32D Rebar&Accessories <br />32D Curb&Gutter <br />32D Site Concrete <br />32D Site Concrete <br />32D ExistingWalkRep <br />32D ExistingWalkRep <br />32D CO#1Eliminatelnsulationatfoundation <br />32D CO#2 PR#2R Thickened FoMing <br />32D CO#3 RFI#21 <br />32D CO#4 PR#03 <br />32D CO#SA511 <br />32D CO#6-PR#14 <br />32D CO#7A5113 <br />32D CO#8 RFI#82 added apron <br />32D CO#9RFI#116AddAltforFencePier <br />Material <br />Labor <br />Material <br />Labor <br />Material <br />Labor <br />Material <br />Labor <br />Material <br />Labor <br />Material <br />Labor <br />Material <br />Labor <br />Material <br />Labor <br />Material <br />SCHEDULED <br />VALUE <br />10,000.00 <br />79,528.00 <br />127,156.00 <br />789,795.50 <br />238,379.00 <br />92,372.00 <br />132,619.00 <br />22,866.00 <br />6,200.00 <br />50,400.00 <br />35,550.00 <br />31,521.00 <br />27,900.00 <br />40,577.00 <br />4,800.00 <br />3,814.00 <br />33,900.00 <br />26,241.00 <br />41,400.00 <br />71,919.00 <br />8,700.00 <br />7,412.00 <br />5,200.00 <br />1,181.00 <br />2,885.00 <br />38,784.00 <br />13,100.00 <br />10,219.00 <br />4,800.00 <br />2,531.00 <br />CHANGE <br />ORDERS <br />$ 737.86 <br />$ 1,830.00 <br />$ 2,856.00 <br />$ - <br />$ - <br />$ <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ <br />$ <br />$ - <br />$ - <br />$ - <br />$ 2,037.71 <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ <br />$ <br />BUDGET <br />REVISION / <br />CONTINGENCV <br />TRANSFER <br />$ (126,756.00) <br />$ 13,254.94 <br />$ (206,779.30) <br />$ - <br />$ - <br />$ 910.00 <br />$ 1,164.00 <br />$ (1,212.00) <br />$ 1,919.00 <br />$ 8,677.00 <br />$ (297.26) <br />$ 182.00 <br />$ (596.00) <br />$ 1,524.00 <br />$ - <br />$ - <br />$ - <br />$ <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ <br />$ <br />$ - <br />$ - <br />$ - <br />$ - <br />$ <br />$ <br />$ - <br />$ - <br />$ (1,143.06) <br />$ - <br />$ 2,240.08 <br />$ 20.09 <br />$ 3,585.12 <br />$ (50.38) <br />$ 3,952.51 <br />$ 496.74 <br />$ 3,362.84 <br />AIA DOCUMENT G703 <br />REVISED WORKCOMPLETED <br />SCHEDULED FROMPREVIOUS THISPERIOD <br />VALUE APPLICATION <br />(D+E) <br />5 io,000.o0 5 io,000.00 <br />$ 80,265.86 $ 80,265.86 <br />$ 400.00 $ 400.00 <br />$ 803,050.44 $ 811,989.88 $ (8,939.44) <br />$ 31,199.70 $ - <br />5 9a,zoz.00 5 9a,zoz.00 <br />$ 132,619.00 $ 132,619.00 <br />$ 2,856.00 $ 2,856.00 <br />$ 910.00 $ 910.00 <br />$ 1,164.00 $ 1,164.00 <br />5 �i,ziz.00� 5 (i,ziz.00� <br />$ 1,919.00 $ 1,919.00 <br />$ 8,677.00 $ 8,677.00 <br />$ (297.26) $ (29716) <br />$ 182.00 $ 182.00 <br />$ (596.00) $ (596.00) <br />$ 1,524.00 $ 1,524.00 <br />$ - $ - <br />$ 22,866.00 S 22,866.00 <br />$ 6,200.00 $ 6,200.00 <br />5 so,aoo.00 5 so,aoo.00 <br />5 as,sso.00 5 as,sso.00 <br />5 ai,szi.00 5 ai,szi.00 <br />5 z�,9oo.00 5 z�,9oo.00 <br />5 ao,sn.00 5 ao,sn.00 <br />$ 4,800.00 $ 4,800.00 <br />$ 3,814.00 $ 3,814.00 <br />$ 33,900.00 $ 33,900.00 <br />5 zb,zai.00 5 zb,zai.00 <br />5 ai,aoo.00 5 ai,aoo.00 <br />$ 71,919.00 $ 71,919.00 <br />$ 8,700.00 $ 8,700.00 <br />$ 7,412.00 $ 7,412.00 <br />$ 5,200.00 $ 5,200.00 <br />$ 1,181.00 $ 1,181.00 <br />$ 2,885.00 $ 2,885.00 <br />5 as,�sa.00 5 as,�sa.00 <br />5 ia,ioo.00 5 ia,ioo.00 <br />5 io,zie.00 5 io,zie.00 <br />$ 4,800.00 $ 4,800.00 <br />$ 2,531.00 $ 2,531.00 <br />$ (1,143.06) $ (1,143.06) <br />$ 2,037.71 $ 2,037.71 <br />$ 2,240.08 $ 2,240.08 <br />$ 20.09 $ 20.09 <br />$ 3,585.12 $ 3,585.12 <br />$ (50.38) $ (50.38) <br />$ 3,952.51 $ 3,952.51 <br />$ 496.74 $ 496.74 <br />$ 3,362.84 $ 3,362.84 <br />MATERIALS <br />PRESENTLV <br />STORED <br />(NOT IN <br />DORE) <br />Elk River FLbIicS#ety Building <br />APPLICATION DATE: 7/30/22 <br />PERIOD TO: 7/30/22 <br />TOTAL % <br />COMPLETED (G+C) <br />ANDSTORED <br />TO DATE <br />(D+E+F) <br />5 io,000.00 ioo.00� � <br />$ 80,265.86 100.00% ! <br />$ 400.00 100.00% ! <br />$ 803,050.44 100.00% ! <br />$ - 0.00% ! <br />5 ea,zoz.00 ioo.00� � <br />$ 132,619.00 100.00% ! <br />$ 2,856.00 100.00% ! <br />$ 910.00 100.00% ! <br />$ 1,164.00 100.00% ! <br />5 �i,ziz.00� ioo.00� � <br />$ 1,919.00 100.00% ! <br />$ 8,677.00 100.00% ! <br />$ (297.26) 100.00% ! <br />$ 182.00 100.00% ! <br />$ (596.00) 100.00% ! <br />$ 1,524.00 100.00% ! <br />$ ' #DIV/0! ! <br />$ 22,866.00 100.00% ! <br />$ 6,200.00 100.00% ! <br />5 so,aoo.00 ioo.00� � <br />5 as,sso.00 ioo.00� � <br />5 ai,szi.00 ioo.00v� � <br />5 z�,eoo.00 ioo.00� � <br />5 ao,sn.00 ioo.00� � <br />$ 4,800.00 100.00% ! <br />$ 3,814.00 100.00% ! <br />$ 33,900.00 100.00% ! <br />5 ze,zai.00 ioo.00� � <br />5 ai,aoo.00 ioo.00� � <br />$ 71,919.00 100.00% ! <br />$ 8,700.00 100.00% ! <br />$ 7,412.00 100.00% ! <br />$ 5,200.00 100.00% ! <br />$ 1,181.00 100.00% ! <br />$ 2,885.00 100.00% ! <br />5 as,�sa.00 ioo.00� � <br />5 ia,ioo.00 ioo.00v� � <br />5 io,zie.00 ioo.00� � <br />$ 4,800.00 100.00% ! <br />$ 2,531.00 100.00% ! <br />$ (1,143.06) 100.00% ! <br />$ 2,037.71 100.00% ! <br />$ 2,240.08 100.00% ! <br />$ 20.09 100.00% ! <br />$ 3,585.12 100.00% ! <br />$ (50.38) 100.00% ! <br />$ 3,952.51 100.00% ! <br />$ 496.74 100.00% ! <br />$ 3,362.84 100.00% ! <br />BAL4NCE <br />TO FINISH <br />(C-G) <br />31,199.70 <br />RETAINAGE <br />5 soo.00 <br />$ 4,01319 <br />$ 20.00 <br />$ 40,152.52 <br />$ - <br />5 a,�io.io <br />$ 6,630.95 <br />$ 142.80 <br />$ 45.50 <br />$ 5810 <br />$ (60.60 <br />$ 95.95 <br />$ 433.85 <br />$ (14.86 <br />$ 9.10 <br />$ (29.80 <br />$ 7610 <br />$ - <br />$ 1,143.30 <br />$ 310.00 <br />5 z,szo.00 <br />5 i,�nso <br />5 i,s�e.os <br />$ 1,395.00 <br />5 z,ozs.ss <br />$ 240.00 <br />$ 190.70 <br />$ 1,695.00 <br />5 i,aiz.os <br />5 z,o�o.00 <br />$ 3,595.95 <br />$ 435.00 <br />$ 370.60 <br />$ 260.00 <br />$ 59.05 <br />$ 14415 <br />$ 1,93910 <br />5 bss.00 <br />5 sioss <br />$ 240.00 <br />$ 126.55 <br />$ (57.15 <br />$ 101.89 <br />$ 112.00 <br />$ 1.00 <br />$ 17916 <br />$ (2.52 <br />$ 197.63 <br />$ 24.84 <br />$ 168.14 <br />