Laserfiche WebLink
1 <br />Slominski, Theresa <br />From:Slominski, Theresa <br />Sent:Monday, July 25, 2022 11:09 AM <br />To:David Roedel; 'bob.meurer@bolton-menk.com'; Ninow, David; Geiser, Tom; <br />'jsargent@newlookcontracting.net'; 'jmitchell@newlookcontracting.net'; <br />'tmicholski@newlookcontracting.net'; 'jason.buboltz@bolton-menk.com'; Brak Braken <br />Cc:Lee Elfering; Sandhoefner, Ryan <br />Subject:RE: CSAH 13 <br />Attachments:CSAH 13 SP 071-613-012 Weekly Meeting Minutes 09292021.pdf <br />Dave,  <br />  <br />Thanks for the reply. My apologies on getting back to you. The holiday and vacations got in the way. We did some  <br />additional digging into details of our own.  <br />  <br />I can understand your willingness to focus on what we were willing to pay with the original quotes and taking the  <br />position we should just pay the full final invoice amount.  We all agree that ERMU should pay for the costs of the  <br />watermain. However, our position is that there was work that had to be redone that should have been avoided, and we  <br />are unwilling to pay for those additional costs. Since the comparison of the quotes and the actual work done seems to  <br />be an obstacle to overcome, we are focusing on some easily identifiable facts.   <br />  <br />In the Weekly Progress Meeting Minutes from 9/29/2021, item 5.h.iii, it states: “Relocation needed if existing lines are  <br />less than 5 feet deep ‐ Insulate from 5 to 7 feet deep” (meeting minutes attached.) After that date the road was graded  <br />and graveled in several areas where insulating and/or lowering of the watermain was necessary, resulting in more street  <br />salvaging and replacing costs.  An area of particular concern is the extra street costs on the south end of the project  <br />between Line Avenue and the gas crossings where the watermain was lowered for 157 feet and insulated another 24  <br />feet. At the south end of that section the watermain was approximately 3 feet deep where the previous offset  <br />completed by New Look was connected back into the original watermain.  Therefore, the watermain work included  <br />redoing a portion of a watermain offset that was already done by New Look and was continuous from that offset to the  <br />gas main.  The total cost of the street salvaging and replacing in that area was $14,554.00. The street repair for 157 feet  <br />of lowering was done at $82.00/lf and the 24 feet of insulating was done at $70.00/lf for a total of $14,554.00.   <br />  <br />We are unwilling to pay for this rework cost of $14,554.00. The total invoice of $212,985.56, less $14,554.00 is  <br />$198,431.56, and that is the maximum amount we will pay. I can certainly take this back to our commission to officially  <br />approve at our next commission meeting August 9.   <br />  <br />Thank you,  <br />Theresa  <br />  <br />Theresa Slominski |General Manager  <br />Elk River Municipal Utilities | ERMUMN.com  <br />w 763.441.2020 | d 763.635.1325 | f 763.441.8099  <br />13069 Orono Parkway | PO Box 430 | Elk River, MN 55330‐0430  <br />  <br />From: David Roedel <David.Roedel@co.sherburne.mn.us>   <br />Sent: Friday, July 1, 2022 5:40 PM  <br />To: Slominski, Theresa <tslominski@ermumn.com>; 'bob.meurer@bolton‐menk.com' <bob.meurer@bolton‐ <br />menk.com>; Ninow, David <dninow@ermumn.com>; Geiser, Tom <tgeiser@ermumn.com>;  <br />'jsargent@newlookcontracting.net' <jsargent@newlookcontracting.net>; 'jmitchell@newlookcontracting.net'  <br />90