My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6b ERMUSR 08-09-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2022
>
08-09-20222
>
5.6b ERMUSR 08-09-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2022 11:46:51 AM
Creation date
8/6/2022 11:46:51 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/9/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />Slominski, Theresa <br />From:Slominski, Theresa <br />Sent:Monday, July 25, 2022 11:09 AM <br />To:David Roedel; 'bob.meurer@bolton-menk.com'; Ninow, David; Geiser, Tom; <br />'jsargent@newlookcontracting.net'; 'jmitchell@newlookcontracting.net'; <br />'tmicholski@newlookcontracting.net'; 'jason.buboltz@bolton-menk.com'; Brak Braken <br />Cc:Lee Elfering; Sandhoefner, Ryan <br />Subject:RE: CSAH 13 <br />Attachments:CSAH 13 SP 071-613-012 Weekly Meeting Minutes 09292021.pdf <br />Dave, <br /> <br />Thanks for the reply. My apologies on getting back to you. The holiday and vacations got in the way. We did some <br />additional digging into details of our own. <br /> <br />I can understand your willingness to focus on what we were willing to pay with the original quotes and taking the <br />position we should just pay the full final invoice amount. We all agree that ERMU should pay for the costs of the <br />watermain. However, our position is that there was work that had to be redone that should have been avoided, and we <br />are unwilling to pay for those additional costs. Since the comparison of the quotes and the actual work done seems to <br />be an obstacle to overcome, we are focusing on some easily identifiable facts. <br /> <br />In the Weekly Progress Meeting Minutes from 9/29/2021, item 5.h.iii, it states: “Relocation needed if existing lines are <br />less than 5 feet deep ‐ Insulate from 5 to 7 feet deep” (meeting minutes attached.) After that date the road was graded <br />and graveled in several areas where insulating and/or lowering of the watermain was necessary, resulting in more street <br />salvaging and replacing costs. An area of particular concern is the extra street costs on the south end of the project <br />between Line Avenue and the gas crossings where the watermain was lowered for 157 feet and insulated another 24 <br />feet. At the south end of that section the watermain was approximately 3 feet deep where the previous offset <br />completed by New Look was connected back into the original watermain. Therefore, the watermain work included <br />redoing a portion of a watermain offset that was already done by New Look and was continuous from that offset to the <br />gas main. The total cost of the street salvaging and replacing in that area was $14,554.00. The street repair for 157 feet <br />of lowering was done at $82.00/lf and the 24 feet of insulating was done at $70.00/lf for a total of $14,554.00. <br /> <br />We are unwilling to pay for this rework cost of $14,554.00. The total invoice of $212,985.56, less $14,554.00 is <br />$198,431.56, and that is the maximum amount we will pay. I can certainly take this back to our commission to officially <br />approve at our next commission meeting August 9. <br /> <br />Thank you, <br />Theresa <br /> <br />Theresa Slominski |General Manager <br />Elk River Municipal Utilities | ERMUMN.com <br />w 763.441.2020 | d 763.635.1325 | f 763.441.8099 <br />13069 Orono Parkway | PO Box 430 | Elk River, MN 55330‐0430 <br /> <br />From: David Roedel <David.Roedel@co.sherburne.mn.us> <br />Sent: Friday, July 1, 2022 5:40 PM <br />To: Slominski, Theresa <tslominski@ermumn.com>; 'bob.meurer@bolton‐menk.com' <bob.meurer@bolton‐ <br />menk.com>; Ninow, David <dninow@ermumn.com>; Geiser, Tom <tgeiser@ermumn.com>; <br />'jsargent@newlookcontracting.net' <jsargent@newlookcontracting.net>; 'jmitchell@newlookcontracting.net' <br />90
The URL can be used to link to this page
Your browser does not support the video tag.