My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.6 ERMUSR 08-09-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2022
>
08-09-20222
>
5.6 ERMUSR 08-09-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2022 11:46:23 AM
Creation date
8/6/2022 11:46:23 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/9/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
______________________________________________________________________________ <br /> <br />Page 1 of 2 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br /> <br />TO: <br />ERMU Commission <br />FROM: <br />Theresa Slominski – General Manager <br />MEETING DATE: <br />August 9, 2022 <br />AGENDA ITEM NUMBER: <br />5.6 <br />SUBJECT: <br />County Road 13 Reconstruction Project Update <br />ACTION REQUESTED: <br />Authorize payment amount to Sherburne County of $198,431.56 for water main pipe relocation <br />and insulating work for the CSAH 13 project. <br /> <br />BACKGROUND: <br />At the November 9, 2021, commission meeting the Commission approved an “amount not to <br />exceed $261,882” for work that needed to be done to lower and insulate water main pipes that <br />weren’t identified early in the CSAH 13 project (the November 9, 2021, memo is attached for <br />reference). We have provided some updates since that meeting that the work was completed, <br />and that we were having discussions on the final costs for ERMU to pay for the project. We <br />have not come to an agreement and would like Commission authorization a different payment <br />maximum amount. <br /> <br />DISCUSSION: <br />The County provided a change order of $212,985.56 for insulating and lowering our water main <br />to complete the CSAH 13 project. Included in the change order are costs for street salvaging <br />and replacement that we believe we should not have to pay for. We have had multiple <br />discussions on arriving at a more reasonable amount, considering amounts included in the <br />original quotes, amounts that should be excluded due to work not having to be done, some <br />prior negotiations of sharing certain costs, estimations versus actuals, etc. We were not able to <br />come to an agreement. The County has taken the position that since the commission approved <br />an amount of $261,882, we should not take exception to the lower cost amount of <br />$212,985.56. <br /> <br />ERMU believes that we should be responsible for the costs of our water main and have no <br />objection to paying for those true costs. However, we have specifically identified 181 feet <br />where road work was re-done because the proper lowering and insulating of water main was <br />not done before the road was placed over the top of it (after specific discussion regarding these <br />proper depths in weekly progress meetings which was documented in 9/29/2021 meeting <br />minutes). We have stated we will not pay for that re-work. We have identified these 181 feet as <br />157 feet of lowered water main and 24 feet of insulated water main, and the associated linear <br />foot (lf) costs for that work total $14,554.00. The street repair for 157 feet of lowering was <br />done at $82.00/lf and the 24 feet of insulating was done at $70.00/lf for a total of $14,554.00. <br />87
The URL can be used to link to this page
Your browser does not support the video tag.