My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4 ERMUSR 08-09-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2022
>
08-09-20222
>
5.4 ERMUSR 08-09-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2022 11:46:01 AM
Creation date
8/6/2022 11:46:01 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
8/9/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
______________________________________________________________________________ <br /> <br />Page 1 of 1 <br /> <br /> <br /> <br /> <br /> <br />UTILITIES COMMISSION MEETING <br /> <br />TO: <br />ERMU Commission <br />FROM: <br />Chris Kerzman – Engineering Manager <br />MEETING DATE: <br />August 9, 2022 <br />AGENDA ITEM NUMBER: <br />5.4 <br />SUBJECT: <br />Field Services Facility Expansion Project Update <br />ACTION REQUESTED: <br />None <br /> <br /> <br />DISCUSSION: <br />Since the special commission meeting, RJM Construction has met with city building officials to <br />finalize requirements for a Temporary Certificate of Occupancy for the inventory space, the <br />electrician has made good progress through the building, and the majority of the drywall is <br />installed upstairs. The painter has finished up the office space and is moving into the larger <br />open office areas. <br /> <br />The concrete subcontractor was on site after the July 29 meeting and has installed the loading <br />dock pad and stairs. Removal of the non-conforming stairs in the front of the building is <br />complete, and RJM advised that the contractor has contractual rights to repair their non- <br />conforming work. RJM and the contractor are having discussions on how to split the stair into <br />smaller pours to have a better chance of success. <br /> <br />Critical work over the next two weeks includes sealing of the south portion of the building <br />which is scheduled to begin during the week of August 8, loading dock ramp installation during <br />the week of August 15, and finalizing the fire system and alarms with city inspections. <br /> <br />RJM has a hearing for the initial steel contractor default on August 5. If there is a judgement <br />staff will give a verbal update at the meeting. <br />85
The URL can be used to link to this page
Your browser does not support the video tag.