My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1 SR 08-01-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
08-01-2022
>
10.1 SR 08-01-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 9:07:12 AM
Creation date
7/28/2022 10:17:20 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/1/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT <br />List of Tables <br />Table 1. Access Spacing Guidelines................................................................................................................... <br />11 <br />Table 2. Access Spacing Compliance Review..................................................................................................... <br />11 <br />Table 3. Level of Service Criteria........................................................................................................................ <br />19 <br />Table4. Gap Acceptance.................................................................................................................................... <br />22 <br />Table5. Crash Type............................................................................................................................................ <br />24 <br />Table 6. Crash and Severity Rates..................................................................................................................... <br />24 <br />Table 7. Preliminary Evaluation Summary .......................................................................................................... <br />42 <br />Table 8. Benefit Cost Analysis - North Segment................................................................................................ <br />43 <br />Table 9. Benefit Cost Analysis - South Segment............................................................................................... <br />43 <br />Table 10. South Segment Alternative Evaluation Summary ............................................................................... <br />51 <br />Table 11. North Segment Long -Term Vision by Phase....................................................................................... <br />58 <br />Table 12. South Segment Long -Term Vision by Phase....................................................................................... <br />59 <br />Table 13. Funding Strategies (External)............................................................................................................. <br />63 <br />Table 14. Funding Strategies (Internal - Taxing)................................................................................................. <br />63 <br />Table 15. Funding Strategies (Internal - Bonding).............................................................................................. <br />64 <br />Table 16. Funding Strategies (Internal - Cost Participation).............................................................................. <br />64 <br />List of Appendices <br />Appendix - Public and Stakeholder Engagement Materials <br />Appendix B - Traffic Analysis Supporting Data for Existing System Analysis <br />Appendix C - Detailed Evaluation Matrices <br />Appendix D - Traffic Analysis Supporting Data for Alternatives Analysis <br />Appendix E - Concept Layouts and Cost Estimates <br />■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.