My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1 SR 08-01-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
08-01-2022
>
10.1 SR 08-01-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 9:07:12 AM
Creation date
7/28/2022 10:17:20 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/1/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT <br />Study Area <br />Shown in Figure 1, the Highway 10 study corridor is approximately 3.5 miles. The limits of the study <br />are from Highway 169 to Jarvis Street/Cleveland Street. Additionally, some areas outside of the <br />Highway 10 corridor were reviewed as part of the study to identify transportation system connectivity. <br />The study segment is primarily within the Elk River city limits with a small portion on the eastern side <br />in the Ramsey city limits. <br />The study includes the following key intersections: <br />• 173rd Avenue <br />• 171st Avenue <br />• 170th Avenue <br />• 167th Avenue <br />• 165th Avenue <br />• Kelly Farm Road <br />a �Hway <br />• Edison Street <br />• Jarvis Street/Cleveland Street <br />• Adams Street North <br />• Adams Street South <br />• Alpine Drive <br />1-0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.