Laserfiche WebLink
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT <br />STUDY OVERVIEW <br />Introduction <br />The City of Elk River along with its partners from MnDOT, Sherburne and Anoka Counties and the City <br />of Ramsey completed the Highway 10 Corridor Study. The goal of the study was to develop a long- <br />term 20+ year vision for the Highway 10 corridor and then build consensus around this vision. The <br />long-term vision would be something that would be implemented over time as opportunities arise <br />and funding becomes available. The goal of the long-term vision is to ensure safe and efficient <br />operations along the Highway 10 corridor while supporting economic development within the area <br />and region. <br />The corridor study focused on Highway 10 between Highway 169 and Jarvis Street, near the <br />Sherburne and Anoka County border. The general study approach is outlined below: <br />• Build upon previous planning efforts <br />• Quantify current and future transportation conditions, issues, and needs <br />• Evaluate transportation improvement alternatives <br />• Engage key stakeholders to solicit input and build understanding <br />• Develop a fiscally responsible implementation plan to support economic development and <br />corridor operations and safety <br />a GHW4y, <br />Page 1 • <br />�RRIOORSN� <br />