My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.1 SR 08-01-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
08-01-2022
>
10.1 SR 08-01-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 9:07:12 AM
Creation date
7/28/2022 10:17:20 AM
Metadata
Fields
Template:
City Government
type
SR
date
8/1/2022
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
499
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HIGHWAY 10 CORRIDOR STUDY - FINAL REPORT <br />Long -Term Vision <br />Following the second round of stakeholder and public engagement, additional discussions with the <br />PMT occurred to confirm the long-term vision for the Highway 10 Corridor would be a grade - <br />separated corridor with interchanges at Highway 169 (existing), Twin Lakes Road and Adams Street <br />(see Figure E--1). Additionally, access closure and a robust local roadway network will be needed to <br />support this long-term vision (see FigureE-Z. <br />Figure E -1. Highway 10 Long -Term Vision <br />■ <br />
The URL can be used to link to this page
Your browser does not support the video tag.