My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6.6.-6.9. SR 10-17-2005
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2000 - 2010
>
2005
>
10/17/2005
>
6.6.-6.9. SR 10-17-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2008 8:35:36 AM
Creation date
10/14/2005 1:40:45 PM
Metadata
Fields
Template:
City Government
type
SR
date
10/17/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Heritage Maples <br />October 13, 2005 <br /> <br />Page 3 <br /> <br />. It appears that an attempt has been made to provide the 40-foot wide drainage and <br />utility easement needed for these utility routings on Building Sites 37 and 40. <br /> <br />. Hydrant locations will be reviewed with the Fire Chief during the final plat review <br />process. <br /> <br />. Sidewalks are shown along the west side of Yankton Street, along the south side of <br />the service road, and around the internal portion of Street A. All sidewalk pedestrian <br />ramps must be constructed in accordance withMnDOT Detail7036F. The precast <br />panel should be red in color. Panels are to be submitted for approval prior to <br />installation. <br /> <br />. The area west of Lots 46 and 47 still appears to be too flat. <br /> <br />. The storm sewer system has been revised slightly based on previous comments. The <br />concept of the storm sewer system is approvable. The detail of the storm sewer <br />calculations still needs to be reviewed. <br /> <br />. It appears that the pond contours have been revised to meet the City standard for <br />grading of pond areas. <br /> <br />. A MnDOT permit will be needed for ditch grading and culvert installation in the 1H <br />10 right-of-way. Will MnDOT accept an increase in the lOa-year discharge from <br />1.79 CFS to 5.07 CFS? <br /> <br />. The Grading Plan shows filling under the power line. This will need to be reviewed <br />and approved by the power company. <br /> <br />D. Miscellaneous Items <br /> <br />. MnDOT has previously contacted the City of Elk River regarding the potential for a <br />Local Initiative Project to build the service road adjacent to 1H 10. With Local <br />Initiative Projects, MnDOT participates in the funding. If the developers and <br />MnDOT are willing to proceed this way, the City could pursue a Local Initiative <br />Project for the construction of this service road. The City would need to be <br />involved, since MnDOT policies do not allow for these types of agreements with <br />individuals. It is unclear whether or not MnDOT would allow the project to proceed <br />and simply reimburse the City for the construction, if a Local Initiative Project were <br />approved. <br /> <br />. A portion of this project which is in Outlot A of West Oaks has previously been <br />assessed for trunk sewer and water. The remaining portion of the project has not. It <br />should be a requirement of the development that the portion not previously assessed <br />be assessed for trunk sewer and water at the current rate. The 2005 assessment rate <br />for trunk sewer and water is $7,163.87 per gross acre minus any delineated wetland <br />area that is not proposed to be filled. <br /> <br />S:\PLANNING\Case Files \2005\P 05-16 Heritage Maples \ 1 0 13 05 engr's memo.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.