Laserfiche WebLink
- --------- <br />/ I / <br />�- <br />! <br />! <br />! <br />J <br />LEGEND:PRO <br />X <br />ED FANIINGRVSEWER <br />?li <br />PROPOSED <br />w FPOPPSED WATER SERVICE <br />0 20 <br />$ Q PROPOSED SANITARY MANHOEE <br />SCA <br />N. PROPOSED FLARED END BECTON <br />o PROPOSED STDRM MANHOLE <br />PRDPD9ED DATCH R1IN <br />PROPOSED GATE VALE s R X <br />lYllANT <br />B PROPosEO CLEANOUT <br />PROPOSED RIP RAP <br />UTILITY GENERAL NOTES: <br />'IT <br />MAY AFFECT THIS WORK <br />ES FOREXACT <br />NG STRUCTURES <br />CONSTRUCTION. <br />IMOF CONNECEISN EITH <br />NOTED.IALLHCPEALL <br />PIPE AND <br />C900 OR GRADE PE-8 <br />OR TYTIRPE IK WAFER P PE <br />CONSECUTIVE PASSING <br />—R, SANITARY <br />SHALL BE <br />THE <br />WNDfNONSN WATER <br />REMOVAL, <br />WITH ARCHITECTURAL <br />1. CONTRACTOR SHALL LOCATE AND VERIFY ALL UTILITIES WNICH <br />AN OTIFY OWHER OF ANY CHANGES CONTAM LOCAL UTILITY LOCATIONS PRIOR TO BIDDING THE PROJECT ANDCOMMENCING=PK <br />8 <br />PND/IXi PAVEMEMS TO REMAIN LfT ES, PARTICULARLY W TH EYJST <br />5. WATERLINETOMINIMUM B.OFEET OEPfH. EOF AND BEGINNING <br />T NEWSAN_RVLINEPRIOR TOINSFALLINXIT G ANYNEW UFIUTIES,AT <br />e RCPETORM SEWER SHAHALLLL BE CL45SVPIFE UNLESS OTHERWISE <br />STORM SEWER SHALL BE DUAL WALL HIGH PERFORMANCE POLYPROPYLENE <br />9. ALL WATER LINES 4" OR GREATER SHALL CONFORM TO AWWA <br />SHALL RE RA1(HULE WATER LINELL ) <br />1 BE RESPONSIBLE FOR OBTAINING TWO <br />EACLERO_DGCALTESTS FR <br />IS AD C OR REMOVED AS A RE-1 OF THE PROPOSED <br />STORM SEWER SERVICE NGTAL_ATION <br />REQ IRED FOR THIS PROJECT, THE PUMP DISCHARGE <br />BEING DISCHARGED OFFRITE OR INTO A SURFACEWATER <br />TRI <br />ATED PRIM To <br />IT DUE TO SANDY SOIL <br />Noo DEWATERNG S IXPECTED FORE HIS SITE <br />S PRO ETS ND ORKAREASTHATAREWITHINTNECITYRIGHF OFWAYWILLBEREFLACEG <br />IN KIND. R PAVEMENT <br />LIT LITP NSTALLATION AND REPLACEMFNT AS NEEDED <br />15 CONTR�,— IS— CCNFIR M FINAL ROOF DRAIN LOCATIONS <br />DRAW 5 <br />`q <br />€ALL= <br />o� v <br />€$3'As <br />O <br />g§gip h�J` <br />mv_2�O <br />E <br />V 55 <br />�50 u50 t� <br />OZ <br />It <br />MS <br />Sg <br />Lua g <br />QU) �� G <br />o a oar pn <br />M .6 6w <br />W Z <br />z <br />3 <br />s <br />�v z z <br />V W Q <br />W > <br />za <br />oN <br />c� <br />z <br />Inc <br />O ° <br />U � <br />V <br />SHEET NO. <br />C3 <br />