My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7.2a SR 07-18-2022
ElkRiver
>
City Government
>
City Council
>
Council Agenda Packets
>
2021 - 2030
>
2022
>
07-18-2022
>
7.2a SR 07-18-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2023 9:17:18 AM
Creation date
7/14/2022 4:29:07 PM
Metadata
Fields
Template:
City Government
type
SR
date
7/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Request for Action <br />Ciry nf <br />Elk <br />River <br />To <br />Item Number <br />Planning Commission <br />4.2 <br />Agenda Section <br />Meeting Date <br />Prepared by <br />Public Hearings <br />June 28, 2022 <br />Chris Leeseberg, Senior Planner <br />Item Description <br />Reviewed by <br />Cornerstone Auto QuickLane- Parcel ID# 75- <br />Jennifer Green, Sr. Administrative Assistant <br />Reviewed by <br />821-0010 - Conditional Use Permit for a Motor <br />Vehicle Specialty Shop (oil change facility), Case <br />No. CU 22-14 <br />Action Requested <br />Recommend, by motion, approval of the Conditional Use Permit as <br />the standards set forth in Section 30-654 have been satisfied. <br />Background/Discussion <br />The property is zoned Focused Area Study (FAST-e) where motor <br />vehicle specialty shops require a Conditional Use Permit (CUP). The <br />applicant is seeking a CUP to construct a 74' x 170' oil change facility <br />on what will be located on Lot 1, Block 1, Jabez Third Addition plat, <br />which will be reviewed by the City Council. <br />Along with oil changes, the facility will accommodate light mechanic <br />work such as tire rotations. Construction is anticipated to begin in the <br />spring of 2023. Once completed, the existing QuickLane located in <br />the Cornerstone facility be relocated to the proposed building and then <br />that existing space will be used for mechanic work. <br />The business with be fully staffed with 15 to 30 full and part time <br />employees. The proposed hours of operation are: <br />7:00 a.m. to 8:00 p.m. Monday through Thursday <br />7:00 a.m. to 6:00 p.m. on Fridays <br />7:00 a.m. to 5:00 p.m. on Saturdays <br />`6 <br />,9 <br />Figure I = - <br />Building Materials <br />The mechanic area will be constructed with concrete tip -up panels while the customer area, facing the streets, will <br />be comprised of architectural metal panels and storefront glass. <br />Transportation/ Circulation <br />Access to the subject site will occur off Cornerstones private drive/access on the west side of the parcel. The site <br />plan shows 60 parking stalls, including two next to the customer area for electric vehicle charging. <br />The Elk River Vision P O N E R E u [NTRjA <br />welcoming community avith revolutionary and spirited resourcefulness, exceptional AU <br />service, and community engagement that encourages and inspires prosperity. Updated. August 2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.