Laserfiche WebLink
m TarERoiv NumberStatic 05 <br />Terra 0 k River on #3 <br />City f E, k <br />MI CONSTRUCTION Cit of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 17 <br />Contractor's signed certification is attached. APPLICATION DATE: 6/30/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 6/30/22 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Ventilation Material <br />$ 84,721.00 <br />$ - <br />$ - <br />$ 84,721.00 <br />$ 84,721.00 <br />$ 84,721.00 <br />100.00% <br />$ - <br />$ 4,236.05 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Plumbing Labor <br />$ 146,790.00 <br />$ - <br />$ - <br />$ 146,790.00 <br />$ 146,790.00 <br />$ 146,790.00 <br />100.00% <br />$ - <br />$ 7,339.50 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Piping Labor <br />$ 78,083.00 <br />$ - <br />$ - <br />$ 78,083.00 <br />$ 78,083.00 <br />$ 78,083.00 <br />100.00% <br />$ - <br />$ 3,904.15 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Insulation Labor <br />$ 35,439.00 <br />$ - <br />$ - <br />$ 35,439.00 <br />$ 35,439.00 <br />$ 35,439.00 <br />100.00% <br />$ - <br />$ 1,771.95 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Ventilation Equipment <br />$ 84,178.00 <br />$ - <br />$ - <br />$ 84,178.00 <br />$ 84,178.00 <br />$ 84,178.00 <br />100.00% <br />$ - <br />$ 4,208.90 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Plumbing Fixtures/Equip <br />$ 96,596.00 <br />$ - <br />$ - <br />$ 96,596.00 <br />$ 96,596.00 <br />$ 96,598.00 <br />100.00% <br />$ - <br />$ 4,929.90 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Piping Equipment <br />$ 57,433.00 <br />$ - <br />$ - <br />$ 57,433.00 <br />$ 57,433.00 <br />$ 57,433.00 <br />100.00% <br />$ - <br />$ 2,871.65 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Refer Piping/Startup <br />$ 4,394.00 <br />$ - <br />$ - <br />$ 4,394.00 <br />$ 4,394.00 <br />$ 4,394.00 <br />100.00% <br />$ - <br />$ 219.70 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Balancing <br />$ 7,976.00 <br />$ - <br />$ - <br />$ 7,976.00 <br />$ 7,976.00 <br />$ 7,976.00 <br />100.00% <br />$ - <br />$ 396.60 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Temp Controls <br />$ 66,259.00 <br />$ - <br />$ - <br />$ 66,259.00 <br />$ 66,259.00 <br />$ 66,259.00 <br />100.00% <br />$ - <br />$ 3,312.95 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Crane <br />$ 1,785.00 <br />$ - <br />$ - <br />$ 1,785.00 <br />$ 1,785.00 <br />$ 1,785.00 <br />100.00% <br />$ - <br />$ 69.25 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Permits <br />$ 15,000.00 <br />$ - <br />$ - <br />$ 15,000.00 <br />$ 15,000.00 <br />$ 15,000.00 <br />100.00% <br />$ - <br />$ 750.00 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Bond <br />$ 8,000.00 <br />$ - <br />$ - <br />$ 8,000.00 <br />$ 8,000.00 <br />$ 8,000.00 <br />100.00% <br />$ - <br />$ 400.00 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -Submittals <br />$ 5,000.00 <br />$ - <br />$ - <br />$ 5,000.00 <br />$ 5,000.00 <br />$ 5,000.00 <br />100.00% <br />$ - <br />$ 250.00 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />Mechanical -General Administration <br />$ 63,330.00 <br />$ - <br />$ - <br />$ 63,330.00 <br />$ 63,330.00 <br />$ 63,330.00 <br />100.00% <br />$ - <br />$ 3,166.50 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#1 PR#3R <br />$ - <br />$ - <br />$ 3,532.00 <br />$ 3,532.00 <br />$ 3,532.00 <br />$ 3,532.00 <br />100.00% <br />$ - <br />$ 176.60 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#2 Added expansion tankforsnow melt <br />$ - <br />$ - <br />$ 2,504.00 <br />$ 2,504.00 <br />$ 2,504.00 <br />$ 2,504.00 <br />100.00% <br />$ - <br />$ 125.20 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#3 App Bay Truck Fill & Compressed Air <br />$ - <br />$ - <br />$ 30,621.00 <br />$ 30,621.00 <br />$ 30,621.00 <br />$ 30,621.00 <br />100.00% <br />$ - <br />$ 1,531.05 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#4 Eye Wash Station <br />$ - <br />$ - <br />$ (949.00) <br />$ (949.00) <br />$ (949.00) <br />$ (949.00) <br />100.00% <br />$ - <br />$ (47.45) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#5 PR#17 SCBA Compressor <br />$ - <br />$ <br />$ 1,790.00 <br />$ 1,790.00 <br />$ 1,790.00 <br />$ 1,790.00 <br />100.00% <br />$ - <br />$ 69.50 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#6 RFI#107 <br />$ - <br />$ - <br />$ (213.00) <br />$ (213.00) <br />$ (213.00) <br />$ (213.00) <br />100.00% <br />$ - <br />$ (10.65) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#7 RFI#121 <br />$ - <br />$ - <br />$ (250.00) <br />$ (250.00) <br />$ (250.00) <br />$ (250.00) <br />100.00% <br />$ - <br />$ (12.50) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#B PR#13 Steam Generator <br />$ - <br />$ - <br />$ 8,342.00 <br />$ 8,342.00 <br />$ 4,923.00 <br />$ 3,419.00 <br />$ 8,342.00 <br />100.00% <br />$ - <br />$ 417.10 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#9 Duct Insulation Replacement (Carp Allowance) $752 <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />$ - <br />#DIV/01 <br />$ - <br />$ - <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#10 Added PVC Insualtion <br />$ - <br />$ - <br />$ 723.00 <br />$ 723.00 <br />$ 723.00 <br />$ 723.00 <br />100.00% <br />$ - <br />$ 36.15 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#11 Bay Duct Relocation due to Air Drop <br />$ - <br />$ - <br />$ 5,666.00 <br />$ 5,666.00 <br />$ 5,666.00 <br />$ 5,666.00 <br />100.00% <br />$ - <br />$ 264.40 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#12 PR#22 <br />$ - <br />$ - <br />$ 709.00 <br />$ 709.00 <br />$ 709.00 <br />$ 709.00 <br />100.00% <br />$ - <br />$ 35.45 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#13 CMU Patch work for Duct 139 Training Room <br />$ - <br />$ - <br />$ (744.50) <br />$ (744.50) <br />$ - <br />$ (744.50) <br />$ (744.50) <br />100.00% <br />$ - <br />$ (37.23) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#14 RFI#163 Revised Exhaust Air Register Size <br />$ - <br />$ - <br />$ 2,503.00 <br />$ 2,503.00 <br />$ - <br />$ 2,503.00 <br />$ 2,503.00 <br />100.00% <br />$ - <br />$ 125.15 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO#15 RFI#139 Credit for Duct Protection <br />$ - <br />$ - <br />$ (470.00) <br />$ (470.00) <br />$ - <br />$ (470.00) <br />$ (470.00) <br />100.00% <br />$ - <br />$ (23.50) <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO Relocate Roof Vent <br />$ - <br />$ - <br />$ 2,046.00 <br />$ 2,046.00 <br />$ - <br />$ 2,046.00 <br />$ 2,046.00 <br />100.00% <br />$ - <br />$ 102.30 <br />Peterson Sheet Metal <br />15-1500 <br />22A <br />CO Vent Hood Backing <br />$ - <br />$ - <br />$ 437.00 <br />$ 437.00 <br />$ - <br />$ 437.00 <br />$ 437.00 <br />100.00% <br />$ - <br />$ 21.65 <br />Summit Fire <br />15-1533 <br />21A <br />Labor <br />$ 18,200.00 <br />$ - <br />$ - <br />$ 18,200.00 <br />$ 18,200.00 <br />$ 18,200.00 <br />100.00% <br />$ - <br />$ 910.00 <br />Summit Fire <br />15-1533 <br />21A <br />Material <br />$ 22,800.00 <br />$ - <br />$ - <br />$ 22,800.00 <br />$ 22,800.00 <br />$ 22,800.00 <br />100.00% <br />$ - <br />$ 1,140.00 <br />Summit Fire <br />15-1533 <br />21A <br />Design <br />$ 3,200.00 <br />$ - <br />$ - <br />$ 3,200.00 <br />$ 3,200.00 <br />$ 3,200.00 <br />100.00% <br />$ - <br />$ 160.00 <br />Summit Fire <br />15-1533 <br />21A <br />Fabrication <br />$ 2,600.00 <br />$ - <br />$ - <br />$ 2,600.00 <br />$ 2,600.00 <br />$ 2,600.00 <br />100.00% <br />$ - <br />$ 130.00 <br />Summit Fire <br />15-1533 <br />21A <br />Bond <br />$ 800.00 <br />$ - <br />$ - <br />$ 800.00 <br />$ 800.00 <br />$ 800.00 <br />100.00% <br />$ - <br />$ 40.00 <br />Summit Fire <br />15-1533 <br />21A <br />CO#1 ASI#9 Redesigned Sprinkler Layout <br />$ - <br />$ - <br />$ 620.00 <br />$ 620.00 <br />$ 620.00 <br />$ 620.00 <br />100.00% <br />$ - <br />$ 41.00 <br />Klein Electric <br />16-1600 <br />26A <br />Electrical -Permit <br />$ 1,325.00 <br />$ - <br />$ - <br />$ 1,325.00 <br />$ 1,325.00 <br />$ 1,325.00 <br />100.00% <br />$ - <br />$ 66.25 <br />Klein Electric <br />16-1600 <br />26A <br />Electrical -Bond <br />$ 4,347.00 <br />$ - <br />$ - <br />$ 4,347.00 <br />$ 4,347.00 <br />$ 4,347.00 <br />100.00% <br />$ - <br />$ 217.35 <br />Klein Electric <br />16-1600 <br />26A <br />Mobilization <br />$ 22,936.00 <br />$ - <br />$ - <br />$ 22,936.00 <br />$ 22,936.00 <br />$ 22,936.00 <br />100.00% <br />$ - <br />$ 1,146.80 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Job Trailer <br />$ 1,710.00 <br />$ - <br />$ - <br />$ 1,710.00 <br />$ 1,710.00 <br />$ 1,710.00 <br />100.00% <br />$ - <br />$ 65.50 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Site <br />$ 3,325.00 <br />$ - <br />$ - <br />$ 3,325.00 <br />$ 3,325.00 <br />$ 3,325.00 <br />100.00% <br />$ - <br />$ 166.25 <br />Klein Electric <br />16-1600 <br />26A <br />Temp Power/Building <br />$ 3,325.00 <br />$ - <br />$ - <br />$ 3,325.00 <br />$ 3,325.00 <br />$ 3,325.00 <br />100.00% <br />$ - <br />$ 166.25 <br />Klein Electric <br />16-1600 <br />26A <br />Switchgear Package/Graybar Electric Co <br />$ 26,645.00 <br />$ <br />$ - <br />$ 28,845.00 <br />$ 28,845.00 <br />$ 28,845.00 <br />100.00% <br />$ - <br />$ 1,442.25 <br />Klein Electric <br />16-1600 <br />26A <br />Utility Fees/Elk River Public Utilities <br />$ 6,279.00 <br />$ - <br />$ - <br />$ 8,279.00 <br />$ 8,279.00 <br />$ 8,279.00 <br />J.00.00% <br />$ - <br />$ 413.95 <br />Page 6 / 10 <br />