Laserfiche WebLink
m TarERoiv NumberStatic 05 <br />Terra 0 k River on #3 <br />City f E, k <br />MI CONSTRUCTION Cit of Elk River <br />CONTINUATION SHEET AIA DOCUMENTG703 <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 17 <br />Contractor's signed certification is attached. APPLICATION DATE: 6/30/22 <br />In tabulations below, amounts are stated to the nearest dollar. PERIOD TO: 6/30/22 <br />Use Column I on Contracts where variable retainage for line items may apply. <br />A <br />A.1 <br />B <br />C <br />CA <br />C.2 <br />C.3 <br />D E <br />F <br />G <br />H <br />I <br />SUBCONTRACTOR <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED <br />CHANGE <br />BUDGET <br />REVISED <br />WORK COMPLETED <br />MATERIALS <br />TOTAL <br />% <br />BALANCE <br />RETAINAGE <br />VENDOR <br />NO. <br />PACK <br />VALUE <br />ORDERS <br />REVISION/ <br />SCHEDULED <br />PRESENTLY <br />COMPLETED <br />(G+C) <br />TO FINISH <br />(IF VARIABLE <br />FROM PREVIOUS <br />THIS PERIOD <br />EMPLOYEE <br />NO. <br />CONTINGENCY <br />VALUE <br />APPLICATION <br />STORED <br />AND STORED <br />(C -G) <br />RATE) <br />COST <br />TRANSFER <br />(D+E) <br />(NOT IN <br />TO DATE <br />CODE <br />D OR E) <br />(D+E+F) <br />Klein Electric <br />16-1600 <br />26A <br />CO#11 RFI#156 <br />$ - <br />$ - <br />$ 696.00 <br />$ 696.00 <br />$ 696.00 <br />$ 696.00 <br />100.00% <br />$ - <br />$ 34.90 <br />Klein Electric <br />16-1600 <br />26A <br />CO#12 ASI#11 Wellness Room Light Fixture <br />$ - <br />$ - <br />$ 1,319.00 <br />$ 1,319.00 <br />$ 1,319.00 <br />$ 1,319.00 <br />100.00% <br />$ - <br />$ 65.95 <br />Klein Electric <br />16-1600 <br />26A <br />CO#13 RFI#160 <br />$ - <br />$ - <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />$ 3,500.00 <br />100.00% <br />$ - <br />$ 175.00 <br />Klein Electric <br />16-1600 <br />26A <br />CO#14 RFI#21 Added Circuits & Unit Heaters <br />$ - <br />$ - <br />$ 1,120.00 <br />$ 1,120.00 <br />$ 1,120.00 <br />$ 1,120.00 <br />100.00% <br />$ - <br />$ 56.00 <br />Klein Electric <br />16-1600 <br />26A <br />CO#15 G9 Light Fixture <br />$ - <br />$ - <br />$ 395.00 <br />$ 395.00 <br />$ 395.00 <br />$ 395.00 <br />100.00% <br />$ - <br />$ 19.75 <br />Klein Electric <br />16-1600 <br />26A <br />CO#16 Omitting Tech Conduit Runs From App Bay <br />$ - <br />$ - <br />$ (1,439.00) <br />$ (1,439.00) <br />$ (1,439.00) <br />$ (1,439.00) <br />100.00% <br />$ - <br />$ (71.95) <br />Klein Electric <br />16-1600 <br />26A <br />CO#17 Training Tower G1 Light Fixtures <br />$ - <br />$ - <br />$ 1,427.00 <br />$ 1,427.00 <br />$ 1,427.00 <br />$ 1,427.00 <br />100.00% <br />$ - <br />$ 71.35 <br />Klein Electric <br />16-1600 <br />26A <br />CO#16 App Bay Sectional Door Control Station <br />$ - <br />$ - <br />$ 2,790.00 <br />$ 2,790.00 <br />$ 2,790.00 <br />$ 2,790.00 <br />100.00% <br />$ - <br />$ 139.50 <br />Klein Electric <br />16-1600 <br />26A <br />CO#19 Thomsen Poured Concrete in Trash Enclosure <br />$ - <br />$ - <br />$ (850.00) <br />$ (850.00) <br />$ (850.00) <br />$ (850.00) <br />100.00% <br />$ - <br />$ (42.50) <br />Klein Electric <br />16-1600 <br />26A <br />CO GFCI Receptacles Laundry <br />$ - <br />$ - <br />$ 1,503.00 <br />$ 1,503.00 <br />$ 1,503.00 <br />$ 1,503.00 <br />100.00% <br />$ - <br />$ 75.15 <br />Dryden Excavating <br />31-1000 <br />31A <br />Mobilization, Bond, SWPP Permit <br />$ 7,000.00 <br />$ - <br />$ - <br />$ 7,000.00 <br />$ 7,000.00 <br />$ 7,000.00 <br />100.00% <br />$ - <br />$ 350.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Bituminous Saw -Cutting Labor <br />$ 2,105.00 <br />$ - <br />$ - <br />$ 2,105.00 <br />$ 2,105.00 <br />$ 2,105.00 <br />100.00% <br />$ - <br />$ 105.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />Bituminous Removal Labor <br />$ 3,640.00 <br />$ - <br />$ - <br />$ 3,640.00 <br />$ 3,640.00 <br />$ 3,640.00 <br />100.00% <br />$ - <br />$ 162.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Concrete Saw -Cutting Labor <br />$ 160.00 <br />$ - <br />$ - <br />$ 160.00 <br />$ 160.00 <br />$ 160.00 <br />100.00% <br />$ - <br />$ 8.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Concrete Removal Labor <br />$ 3,236.00 <br />$ - <br />$ - <br />$ 3,236.00 <br />$ 3,236.00 <br />$ 3,236.00 <br />100.00% <br />$ - <br />$ 161.60 <br />Dryden Excavating <br />31-1000 <br />31A <br />Tree Protection Labor <br />$ 75.00 <br />$ - <br />$ - <br />$ 75.00 <br />$ 75.00 <br />$ 75.00 <br />100.00% <br />$ - <br />$ 3.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Clearing & Grubbing Labor <br />$ 2,100.00 <br />$ - <br />$ - <br />$ 2,100.00 <br />$ 2,100.00 <br />$ 2,100.00 <br />100.00% <br />$ - <br />$ 105.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Topsoil Stripping & Emb. Labor <br />$ 1,386.00 <br />$ - <br />$ - <br />$ 1,386.00 <br />$ 1,386.00 <br />$ 1,386.00 <br />100.00% <br />$ - <br />$ 69.30 <br />Dryden Excavating <br />31-1000 <br />31A <br />Export Excess Topsoil Labor <br />$ 14,055.00 <br />$ - <br />$ - <br />$ 14,055.00 <br />$ 14,055.00 <br />$ 14,055.00 <br />100.00% <br />$ - <br />$ 702.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Site Grading Labor <br />$ 56,076.01 <br />$ - <br />$ - <br />$ 56,076.01 <br />$ 55,459.08 <br />$ 616.93 <br />$ 56,076.01 <br />100.00% <br />$ - <br />$ 2,803.80 <br />Dryden Excavating <br />31-1000 <br />31A <br />Site Grading Material <br />$ 14,040.00 <br />$ - <br />$ - <br />$ 14,040.00 <br />$ 14,040.00 <br />$ 14,040.00 <br />100.00% <br />$ - <br />$ 702.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Exc. & Backfill Foundations <br />$ 25,378.00 <br />$ - <br />$ - <br />$ 25,378.00 <br />$ 25,378.00 <br />$ 25,378.00 <br />100.00% <br />$ - <br />$ 1,268.90 <br />Dryden Excavating <br />31-1000 <br />31A <br />Building Sand Cushion Labor <br />$ 3,298.00 <br />$ - <br />$ - <br />$ 3,298.00 <br />$ 3,298.00 <br />$ 3,298.00 <br />100.00% <br />$ - <br />$ 164.90 <br />Dryden Excavating <br />31-1000 <br />31A <br />Building Sand Cushion Material <br />$ 629.00 <br />$ - <br />$ - <br />$ 629.00 <br />$ 629.00 <br />$ 629.00 <br />100.00% <br />$ - <br />$ 31.45 <br />Dryden Excavating <br />31-1000 <br />31A <br />Class 5 Labor <br />$ 9,014.00 <br />$ - <br />$ - <br />$ 9,014.00 <br />$ 9,014.00 <br />$ 9,014.00 <br />100.00% <br />$ - <br />$ 450.70 <br />Dryden Excavating <br />31-1000 <br />31A <br />Class 5 Material <br />$ 7,854.00 <br />$ - <br />$ - <br />$ 7,854.00 <br />$ 7,854.00 <br />$ 7,854.00 <br />100.00% <br />$ - <br />$ 392.70 <br />Dryden Excavating <br />31-1000 <br />31A <br />Subgrade Prep Labor <br />$ 8,595.00 <br />$ - <br />$ - <br />$ 8,595.00 <br />$ 8,595.00 <br />$ 8,595.00 <br />100.00% <br />$ - <br />$ 429.75 <br />Dryden Excavating <br />31-1000 <br />31A <br />Dewatering Labor <br />$ 2,625.00 <br />$ - <br />$ - <br />$ 2,625.00 <br />$ 2,625.00 <br />$ 2,625.00 <br />100.00% <br />$ - <br />$ 131.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />SWPP Permit <br />$ 525.00 <br />$ - <br />$ - <br />$ 525.00 <br />$ 525.00 <br />$ 525.00 <br />100.00% <br />$ - <br />$ 26.25 <br />Dryden Excavating <br />31-1000 <br />31A <br />Silt Fence Labor <br />$ 2,240.00 <br />$ - <br />$ - <br />$ 2,240.00 <br />$ 2,240.00 <br />$ 2,240.00 <br />100.00% <br />$ - <br />$ 112.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Silt Fence Material <br />$ 700.00 <br />$ - <br />$ - <br />$ 700.00 <br />$ 700.00 <br />$ 700.00 <br />100.00% <br />$ - <br />$ 35.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Inlet Protection Labor <br />$ 2,502.00 <br />$ - <br />$ - <br />$ 2,502.00 <br />$ 2,502.00 <br />$ 2,502.00 <br />100.00% <br />$ - <br />$ 125.10 <br />Dryden Excavating <br />31-1000 <br />31A <br />Construction Entrance Labor <br />$ 2,000.00 <br />$ - <br />$ - <br />$ 2,000.00 <br />$ 2,000.00 <br />$ 2,000.00 <br />100.00% <br />$ - <br />$ 100.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Construction Entrance Materials <br />$ 100.00 <br />$ - <br />$ - <br />$ 100.00 <br />$ 100.00 <br />$ 100.00 <br />100.00% <br />$ - <br />$ 5.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Hydro Seed <br />$ 1,166.00 <br />$ - <br />$ - <br />$ 1,166.00 <br />$ 1,166.00 <br />$ 1,166.00 <br />100.00% <br />$ - <br />$ 56.30 <br />Dryden Excavating <br />31-1000 <br />31A <br />Flex Mat Labor <br />$ 700.00 <br />$ - <br />$ - <br />$ 700.00 <br />$ - <br />$ 700.00 <br />$ 700.00 <br />100.00% <br />$ - <br />$ 35.00 <br />Dryden Excavating <br />31-1000 <br />31A <br />Flex Mat Material <br />$ 3,266.00 <br />$ - <br />$ - <br />$ 3,266.00 <br />$ 3,266.00 <br />$ 3,266.00 <br />100.00% <br />$ - <br />$ 163.30 <br />Dryden Excavating <br />31-1000 <br />33A <br />Mobilization, Bond, Permits <br />$ 20,504.16 <br />$ - <br />$ - <br />$ 20,504.16 <br />$ 20,504.16 <br />$ 20,504.16 <br />100.00% <br />$ - <br />$ 1,025.21 <br />Dryden Excavating <br />31-1000 <br />33A <br />Water Utilities Labor <br />$ 25,719.19 <br />$ - <br />$ - <br />$ 25,719.19 <br />$ 25,719.19 <br />$ 25,719.19 <br />100.00% <br />$ - <br />$ 1,285.96 <br />Dryden Excavating <br />31-1000 <br />33A <br />Water Utilities Material <br />$ 52,306.23 <br />$ - <br />$ - <br />$ 52,306.23 <br />$ 52,306.23 <br />$ 52,306.23 <br />100.00% <br />$ - <br />$ 2,615.31 <br />Dryden Excavating <br />31-1000 <br />33A <br />Wet Tap Labor <br />$ 239.22 <br />$ - <br />$ - <br />$ 239.22 <br />$ 239.22 <br />$ 239.22 <br />100.00% <br />$ - <br />$ 11.96 <br />Dryden Excavating <br />31-1000 <br />33A <br />Wet Tap Material <br />$ 2,500.00 <br />$ - <br />$ - <br />$ 2,500.00 <br />$ 2,500.00 <br />$ 2,500.00 <br />100.00% <br />$ - <br />$ 125.00 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Piping Labor <br />$ 9,667.77 <br />$ - <br />$ - <br />$ 9,667.77 <br />$ 9,667.77 <br />$ 9,667.77 <br />100.00% <br />$ - <br />$ 463.39 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Piping Material <br />$ 9,622.35 <br />$ - <br />$ - <br />$ 9,622.35 <br />$ 9,622.35 <br />$ 9,622.35 <br />100.009 <br />$ - <br />$ 461.12 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Manholes Labor <br />$ 11608.00 <br />$ - <br />$ - <br />$ 1,808.00 <br />$ 1,808.00 <br />$ 1,808.00 <br />100.00% <br />$ - <br />$ 90.40 <br />Dryden Excavating <br />31-1000 <br />33A <br />Sanitary Manholes Material <br />$ 9,425.00 <br />$ - <br />$ - <br />$ 9:425.00 <br />$ 9:425.00 <br />$ 9,425.00 <br />100.00% <br />$ - <br />$ 471.25 <br />Dryden Excavating <br />31-1000 <br />33A <br />Manhole Castings Labor <br />$ 691.20 <br />$ - <br />$ - <br />$ 691.20 <br />$ 691.20 <br />$ 691.20 <br />100.00% <br />$ - <br />$ 34.56 <br />Page 9/10 <br />