Laserfiche WebLink
Minnesota / Wisconsin Playground <br />5101 Highway 55, Suite 6000 <br />Golden Valley, Minnesota 55422 <br />Ph. 800-622-5425 1 763-546-7787 <br />Fax 763-546-50501 bm@mnwiplay.com <br />CONSULTANT: TIM NEWGARD <br />06/24/2022 <br />Quote # <br />100916-01-13 <br />City of Elk River- Youth Athletic Complex- 2nd Shelter - Installation - <br />D10442T <br />Project Scope: <br />Please note, installation is based on site being ready prior to our arrival to install play equipment as well as site conditions that have been conveyed <br />to our organization by the owner/owner's representative and/or ideal conditions existing for a timely completion of your project as quoted. Unless <br />addressed prior to the installation quote being issued or specifically mentioned herein, any issues that arise that impede the progress/completion of <br />your project as quoted will result in additional charges. <br />Weather can change project scheduling in many ways. Take rain for an example. Day, or days, before rain... If weather forecasts show a high <br />percentage chance for rain that will effect the site conditions, a postponement may be in order. Digging holes, laying certain surfacing materials, <br />etc., are greatly affected by weather conditions and work may not begintcontinue due to weather forecasts. There's the rain days themselves, which <br />if heavy enough rainfall occurs, makes a site unworkable. Day, or days, after rain... Drying time will be needed after rain and the number of days <br />needed will vary depending on amount of moisture received. One actual rain day may equal multiple delay days depending on work scheduled to <br />be done. <br />+ INCLUSIONS + <br />+ One mobilization <br />+ Public utility locates only <br />+ Supply of shelter materials as outlined on quote # 100916-01-01_ <br />+ Marking and digging of footings holes as needed <br />+ Unpacking of shelter materials <br />+ Assembly of shelter and materials <br />+ Concrete for footings / slab as needed <br />+ Pouring of concrete for footings / slab and rebar <br />+ Concrete slab <br />+ Excavation <br />+ Disposal of Packaging Material <br />+ Construction tape/temporary bracing (as needed) <br />+ Standard insurance offerings <br />+ Standard warranty offerings <br />+ Standard industry accepted labor wages <br />- EXCLUSIONS - <br />- Clear access path up to and into play area for installation equipment (minimum of 8-foot wide, includes but not limited to gates, walkways, <br />driveways, etc.) <br />- Staging area for materials and installation equipment, trailers, etc. <br />- Unobstructed space for maneuvering installation equipment as well as performing work <br />- If fencing is in place (by others), ability to unlock fencing is to be provided to our office a minimum of one week prior to our start <br />- Private utility locates such as, but not limited to, irrigation, fiber optics, private lighting, etc. <br />- Sitework of any kind such as, but not limited to, grading (play area to have max slope of 1 %), site restoration, drainage, etc. <br />- Removal of existing play equipment, border, safety surfacing, etc. <br />- Backfill and compaction of backfill after removal of existing items (for footing holes as an example) that leave voids in area (marking and digging of <br />new footing holes based on workable site) <br />- Digging in compacted sub -surfaces, rock, hard pan, tree roots, unstable soil conditions, etc. <br />- Restoration of compacted sub -surfaces for playground surfacings such as, but not limited to, poured -in -place rubber, rubber tiles, artificial turf, etc. <br />- Digging/maneuvering in sand, pea gravel, mud, etc. <br />- Offsite removal of spoils from footing holes (can be stockpiled near play area for owner/owner's representative removal or spread within play <br />area) <br />- Playground safety surfacing <br />- Border to help contain playground safety surfacing <br />- Removal of temporary braces, caution/construction tape, etc. (Can be removed and disposed of after concrete has cured.) <br />- Prevailing, Davis Bacon, Union, or similar, wages <br />- Restroom facilities, see below for specifics <br />Page 2 of 3 <br />rT I <br />