Laserfiche WebLink
I Terra <br />SUBCONTRACTOR <br />VENDOR <br />EMPLOYEE <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />Klein Electric <br />CONTINUATION SHEET <br />AIA Document G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing <br />Contractor's signed certification is attached. <br />In tabulations below, amounts are stated to the nearest dollar. <br />Use Column I on Contracts where variable retainage for line items may apply. <br />AIA DOCUMENT G703 <br />A <br />A.1 <br />B <br />C CA <br />C.2 <br />C.3 <br />D <br />E <br />ITEM <br />BID <br />DESCRIPTION OF WORK <br />SCHEDULED CHANGE <br />BUDGET <br />REVISED <br />WORK CO APLETED <br />NO. <br />PACK <br />VALUE ORDERS <br />REVISION/ <br />SCHEDULED FROM PREVIOUS THIS <br />PERIOD <br />NO. <br />CONTINGENCY <br />VALUE APPLICATION <br />COST <br />TRANSFER <br />(D + E) <br />CODE <br />16-1600 <br />26A <br />Utility Transformer Pad Material <br />$ <br />1,045.00 $ - <br />$ - <br />$ 1,045.00 $ <br />1,045.00 <br />16-1600 <br />26A <br />Utility Transformer Pad Labor <br />$ <br />1,425.00 $ - <br />$ - <br />$ 1,425.00 $ <br />1,425.00 <br />16-1600 <br />26A <br />Service Entrance Material <br />$ <br />4,834.00 $ - <br />$ - <br />$ 4,834.00 $ <br />4,834.00 <br />16-1600 <br />26A <br />Service Entrance Labor <br />$ <br />3,827.00 $ - <br />$ - <br />$ 3,827.00 $ <br />3,827.00 <br />16-1600 <br />26A <br />Service Equipment Material <br />$ <br />2,776.00 $ - <br />$ - <br />$ 2,776.00 $ <br />2,776.00 <br />16-1600 <br />26A <br />Service Equipment Labor <br />$ <br />3,277.00 $ - <br />$ - <br />$ 3,277.00 $ <br />3,277.00 <br />16-1600 <br />26A <br />Power Panelboards Material <br />$ <br />2,739.00 $ - <br />$ - <br />$ 2,739.00 $ <br />2,739.00 <br />16-1600 <br />26A <br />Power Panelboards Labor <br />$ <br />2,856.00 $ - <br />$ - <br />$ 2,856.00 $ <br />2,856.00 <br />16-1600 <br />26A <br />Generator Package/Total Energy Systems <br />$ <br />79,282.00 $ - <br />$ - <br />$ 79,282.00 $ <br />23,977.00 $ <br />55,305.00 <br />16-1600 <br />26A <br />Generator Pad Material <br />$ <br />1,235.00 $ - <br />$ - <br />$ 1,235.00 $ <br />- $ <br />1,235.00 <br />16-1600 <br />26A <br />Generator Pad Labor <br />$ <br />1,710.00 $ - <br />$ - <br />$ 1,710.00 $ <br />- $ <br />1,710.00 <br />16-1600 <br />26A <br />Generator Material <br />$ <br />1,562.00 $ - <br />$ - <br />$ 1,562.00 $ <br />- $ <br />- <br />16-1600 <br />26A <br />Generator Labor <br />$ <br />4,091.00 $ - <br />$ - <br />$ 4,091.00 $ <br />- <br />16-1600 <br />26A <br />Generator Service Entrance Material <br />$ <br />3,841.00 $ - <br />$ - <br />$ 3,841.00 $ <br />960.00 $ <br />2,497.00 <br />16-1600 <br />26A <br />Generator Service Entrance Labor <br />$ <br />3,599.00 $ - <br />$ - <br />$ 3,599.00 $ <br />900.00 $ <br />2,339.00 <br />16-1600 <br />26A <br />ATS Equipment Material <br />$ <br />2,309.00 $ - <br />$ - <br />$ 2,309.00 $ <br />2,309.00 <br />16-1600 <br />26A <br />ATS Equipment Labor <br />$ <br />2,901.00 $ - <br />$ - <br />$ 2,901.00 $ <br />2,901.00 <br />16-1600 <br />26A <br />ES Panelboards Material <br />$ <br />801.00 $ - <br />$ - <br />$ 801.00 $ <br />801.00 <br />16-1600 <br />26A <br />ES Panelboards Labor <br />$ <br />1,146.00 $ - <br />$ - <br />$ 1,146.00 $ <br />1,146.00 <br />16-1600 <br />26A <br />Light Fixture Package/Viking Electric <br />$ <br />94,954.00 $ - <br />$ - <br />$ 94,954.00 $ <br />94,954.00 <br />16-1600 <br />26A <br />Fixture Material <br />$ <br />6,196.00 $ - <br />$ - <br />$ 6,196.00 $ <br />5,035.00 $ <br />1,161.00 <br />16-1600 <br />26A <br />Fixture Labor <br />$ <br />21,162.00 $ - <br />$ - <br />$ 21,162.00 $ <br />21,160.00 $ <br />2.00 <br />16-1600 <br />26A <br />Fixture Control Material <br />$ <br />1,572.00 $ - <br />$ - <br />$ 1,572.00 $ <br />1,258.00 $ <br />314.00 <br />16-1600 <br />26A <br />Fixture Control Labor <br />$ <br />4,632.00 $ - <br />$ - <br />$ 4,632.00 $ <br />3,706.00 $ <br />926.00 <br />16-1600 <br />26A <br />HVLS Fan/Big Ass Fans <br />$ <br />10,123.00 $ - <br />$ - <br />$ 10,123.00 $ <br />10,123.00 <br />16-1600 <br />26A <br />HVLS Fan Material <br />$ <br />313.00 $ - <br />$ - <br />$ 313.00 $ <br />94.00 $ <br />219.00 <br />16-1600 <br />26A <br />HVLS Fan Labor <br />$ <br />878.00 $ - <br />$ - <br />$ 878.00 $ <br />263.00 $ <br />615.00 <br />16-1600 <br />26A <br />Site Pole Bases Material <br />$ <br />2,320.00 $ - <br />$ - <br />$ 2,320.00 $ <br />116.00 $ <br />2,204.00 <br />16-1600 <br />26A <br />Site Pole Bases Labor <br />$ <br />2,546.00 $ - <br />$ - <br />$ 2,546.00 $ <br />127.00 $ <br />2,419.00 <br />16-1600 <br />26A <br />Site Pole Underground Material <br />$ <br />2,318.00 $ - <br />$ - <br />$ 2,318.00 $ <br />1,159.00 $ <br />1,159.00 <br />16-1600 <br />26A <br />Site Pole Underground Labor <br />$ <br />3,041.00 $ - <br />$ - <br />$ 3,041.00 $ <br />1,520.00 $ <br />1,521.00 <br />16-1600 <br />26A <br />Site Pole Install Material <br />$ <br />98.00 $ - <br />$ - <br />$ 98.00 $ <br />- <br />16-1600 <br />26A <br />Site Pole Install Labor <br />$ <br />1,126.00 $ - <br />$ - <br />$ 1,126.00 $ <br />- <br />16-1600 <br />26A <br />Site Flag Pole -Sign Material <br />$ <br />1,757.00 $ - <br />$ - <br />$ 1,757.00 $ <br />879.00 <br />16-1600 <br />26A <br />Site Flag Pole -Sign Labor <br />$ <br />1,982.00 $ - <br />$ - <br />$ 1,982.00 $ <br />991.00 <br />16-1600 <br />26A <br />Site Grill-Recept Material <br />$ <br />376.00 $ - <br />$ - <br />$ 376.00 $ <br />19.00 $ <br />75.00 <br />16-1600 <br />26A <br />Site Grill-Recept Labor <br />$ <br />507.00 $ - <br />$ - <br />$ 507.00 $ <br />25.00 $ <br />101.00 <br />16-1600 <br />26A <br />Power -Device Material <br />$ <br />15,167.00 $ - <br />$ - <br />$ 15,167.00 $ <br />12,133.00 $ <br />3,034.00 <br />16-1600 <br />26A <br />Power -Device Labor <br />$ <br />26,781.00 $ - <br />$ - <br />$ 26,781.00 $ <br />21,424.00 $ <br />5,357.00 <br />16-1600 <br />26A <br />Floor Boxes/Graybar Electric Co <br />$ <br />2,011.00 $ - <br />$ - <br />$ 2,011.00 $ <br />2,011.00 <br />16-1600 <br />26A <br />Floor Box Material <br />$ <br />668.00 $ - <br />$ - <br />$ 668.00 $ <br />668.00 <br />16-1600 <br />26A <br />Floor Box Labor <br />$ <br />2,021.00 $ - <br />$ - <br />$ 2,021.00 $ <br />2,021.00 <br />16-1600 <br />26A <br />Cord Reels/Graybar Electric Co <br />$ <br />3,585.00 $ - <br />$ - <br />$ 3,585.00 $ <br />3,585.00 <br />16-1600 <br />26A <br />Cord Reels Material <br />$ <br />496.00 $ - <br />$ - <br />$ 496.00 $ <br />496.00 <br />16-1600 <br />26A <br />Cord Reels Labor <br />$ <br />1,694.00 $ - <br />$ - <br />$ 1,694.00 $ <br />1,694.00 <br />16-1600 <br />26A <br />OHD Material <br />$ <br />1,247.00 $ - <br />$ - <br />$ 1,247.00 $ <br />1,247.00 <br />16-1600 <br />26A <br />OHD Labor <br />$ <br />2,742.00 $ - <br />$ - <br />$ 2,742.00 $ <br />2,742.00 <br />16-1600 <br />26A <br />Air Comprssor Material <br />$ <br />325.00 $ - <br />$ - <br />$ 325.00 $ <br />325.00 <br />Page 7 / 10 <br />F <br />MATERIALS <br />PRESENTLY <br />STORED <br />(NOT IN <br />D OR E) <br />Tara Proj8wt Number 20 705 <br />0 k River F reStati on #3 <br />City of El k River <br />APPLICATION NO: 16 <br />APPLICATION DATE: 5/31/22 <br />PERIOD TO: 5/31/22 <br />TOTAL <br />COMPLETED <br />AND STORED <br />TO DATE <br />(D+E+F) <br />$ 1,045.00 <br />$ 1,425.00 <br />$ 4,834.00 <br />$ 3,827.00 <br />$ 2,776.00 <br />$ 3,277.00 <br />$ 2,739.00 <br />$ 2,856.00 <br />$ 79,282.00 <br />$ 1,235.00 <br />$ 1,710.00 <br />$ <br />3,457.00 <br />3,239.00 <br />2,309.00 <br />2,901.00 <br />801.00 <br />1,146.00 <br />94,954.00 <br />6,196.00 <br />21,162.00 <br />1,572.00 <br />4,632.00 <br />10,123.00 <br />313.00 <br />878.00 <br />2,320.00 <br />2,546.00 <br />2,318.00 <br />3,041.00 <br />879.00 <br />991.00 <br />94.00 <br />126.00 <br />15,167.00 <br />26,781.00 <br />2,011.00 <br />668.00 <br />2,021.00 <br />3,585.00 <br />496.00 <br />1,694.00 <br />1,247.00 <br />2,742.00 <br />325.00 <br />H I <br />% BALANCE RETAINAGE <br />(G+C) TO FINISH (IF VARIABLE <br />(C-G) RATE) <br />100.00% $ - $ 52.25 <br />100.00% $ - $ 71.25 <br />100.00% $ - $ 241.70 <br />100.00% $ - $ 191.35 <br />100.00% $ - $ 138.80 <br />100.00% $ - $ 163.85 <br />100.00% $ - $ 136.95 <br />100.00% $ - $ 142.80 <br />100.00% $ - $ 3,964.10 <br />100.00% $ - $ 61.75 <br />100.00% $ - $ 85.50 <br />0.00% $ 1,562.00 $ - <br />0.00% $ 4,091.00 $ - <br />90.00% $ 384.00 $ 172.85 <br />90.00% $ 360.00 $ 161.95 <br />100.00% $ - $ 115.45 <br />100.00% $ - $ 145.05 <br />100.00% $ - $ 40.05 <br />100.00% $ - $ 57.30 <br />100.00% $ - $ 4,747.70 <br />100.00% $ - $ 309.80 <br />100.00% $ - $ 1,058.10 <br />100.00% $ - $ 78.60 <br />100.00% $ - $ 231.60 <br />100.00% $ - $ 506.15 <br />100.00% $ - $ 15.65 <br />100.00% $ - $ 43.90 <br />100.00% $ - $ 116.00 <br />100.00% $ - $ 127.30 <br />100.00% $ - $ 115.90 <br />100.00% $ - $ 152.05 <br />0.00% $ 98.00 $ - <br />0.00% $ 1,126.00 $ - <br />50.03% $ 878.00 $ 43.95 <br />50.00% $ 991.00 $ 49.55 <br />25.00% $ 282.00 $ 4.70 <br />24.85% $ 381.00 $ 6.30 <br />100.00% $ - $ 758.35 <br />100.00% $ - $ 1,339.05 <br />100.00% $ - $ 100.55 <br />100.00% $ - $ 33.40 <br />100.00% $ - $ 101.05 <br />100.00% $ - $ 179.25 <br />100.00% $ - $ 24.80 <br />100.00% $ - $ 84.70 <br />100.00% $ - $ 62.35 <br />100.00% $ - $ 137.10 <br />100.00% $ - $ 16.25 <br />