Laserfiche WebLink
UTILITIES COMMISSION MEETING <br />TO:FROM: <br />ERMU Commission Chris Kerzman –Engineering Manager <br />MEETING DATE: AGENDA ITEM NUMBER: <br />June 14, 2022 5.2 <br />SUBJECT: <br />Field Services Facility Expansion Project Update <br />ACTION REQUESTED: <br />None <br />DISCUSSION: <br />Over the past month, framing on the second floor has been installed, and rough-in work has <br />been moving along well. Window installation on the north elevation of the building has been <br />going very smoothly. With windows and rough-ins finishing up, drywall and painting/finish work <br />will be starting soon. The chassis wash equipment has been installed in the wash bay, and the <br />crane equipment has been installed in the repair bay. Through most of the south areas of the <br />building, contractors are finalizing control systems and detail work. The garage door jambs have <br />been repaired, and garage doors are staged at the shop ready for installation. <br /> <br />Upcoming work for the next month is expected to include installation of garage doors, <br />continued work on the second level, and focus on the detail through the south portion of the <br />building; the inventory area, wash bay, and repair bay all need HVAC, lighting, and fire system <br />details finished. The garage area has some repair work needed, as well as control work. First <br />level workshops and lunchroom are drywalled, and finish work is beginning. <br /> <br /> <br />______________________________________________________________________________ <br />Page 1 of 1 <br />139 <br />