Laserfiche WebLink
Request for Proposals <br />Northeast Elk River Urban Services Expansion Study <br />-------------------------- <br />Page 2 of 6 <br />survey). It is presumed that the storm system is undersized for the amount of volume it <br />receives. The stormwater within Morton Avenue at 319 Morton Avenue has occasionally <br />found its way through the private driveway, outside of the right-of-way. <br />The intent of this study will require surveying in certain areas of the subwatershed in order <br />to identify existing emergency overflow locations, and to identify potential areas for <br />stormwater treatment and necessary proposed emergency overflow areas. The intent is not <br />to purchase any property or homes for stormwater volume treatment, instead the intent is to <br />use existing public right-of-way. Potential dialog may be started with the Minnesota <br />Department of Transportation if necessary for potential recommendations in the 41h Street <br />and TH10 area. <br />SECTION 2: OVERALL SCOPE OF SERVICES <br />The services required of the Consultant are anticipated to be provided beginning in June <br />2022. The following are general work tasks and deliverables that shall be included in the <br />Consultant's proposal <br />1. Full hydrologic modeling of this subwatershed. An estimate of the subwatershed is <br />attached but will need to be fully determined by the consultant during the study, <br />along with any other associated details. <br />2. Topographic survey of necessary properties to determine drainage area, existing <br />physical and/or overland emergency overflows, potential impoundments, and any <br />other surveying necessary to determine potential recommended solutions that will <br />provide volume treatment for stormwater in this subwatershed. <br />3. Provide recommended solutions to achieve alleviate highwater caused by stormwater <br />during precipitation events (i.e. wet pond(s), dry pond(s), underground infiltration or <br />filtration pipe system(s) or existing stormwater pipe modifications within reason etc. <br />SECTION 3: REQUEST FOR PROPOSALS (RFP) <br />The RFP submittal shall contain only the information requested below. <br />RFP Format <br />The submittal should follow the Table of Contents listed below: <br />1. General Information <br />2. Project Understanding <br />3. Project Approach <br />4. Proposed Project Team and Experience <br />5. Schedule <br />6. Any Additional Information as Needed <br />7. Total Consultant Cost <br />8. Insurance Certificate <br />A brief description of each section is as follows: <br />\\dc3-elkr\shared\Departments\Public Works\Engineering\$IMPROVEMENT PROJECTS\2022 Improvement <br />Projects\Morton Avenue Subwatershed Hydrologic Modeling\RFP Morton Avenue.doc <br />