My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ERMU RES 22-08
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Resolutions
>
2022
>
ERMU RES 22-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2024 9:57:21 AM
Creation date
5/16/2022 12:05:13 PM
Metadata
Fields
Template:
City Government
type
ERMUR
date
5/10/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exh ib it A <br />COGENERATION AND SMALL POWER PRODUCTION TARIFF <br />TARIFF <br />Pursuant to its Rules Governing the Interconnection of Cogeneration and Small Power <br />Production Facilities, Elk River Municipal Utilities ("Utility") establishes and/or updates its <br />Cogeneration and Small Power Production Tariff ("Tariff') for billing and sales <br />transactions following the date of Tariff approval as follows. <br />The Tariff shall consist of the following three schedules. <br />SCHEDULE 1. <br />Calculation of average retail utility energy rates for each utility customer class. <br />S C HEDULE 2. <br />Rates at which Utility purchases energy and capacity from the wholesale supplier from <br />which purchases may first be avoided. <br />SCHEDULE 3 . <br />Utility's adopted interconnection process, or "distributed generation tariff' adopted in <br />compliance with Minnesota Statutes Section 216B.1611, subd. 3(2), including standard <br />contract forms to be used with customers interconnecting qualifying facilities as well as <br />general technical interconnection and interoperability requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.