Laserfiche WebLink
Source <br />Code Title <br />Description <br />Finding and marking locations of buried conduit, cables, hand holes, loops, etc. in order to maintain or repair the traffic <br />1875 Locate One Call <br />management system, signal systems, or roadway lighting systems. <br />Performing construction phase and research physical and chemical laboratory testing, and related technical services in the <br />districts and central labs, and for performing research and construction phase non-destructive testing materials surveys, and <br />related technical services in the field and offices. Includes detour surveys. Non-destructive tests include, skid resistance and falling <br />1732 Material Testing & Inspection <br />weight deflectometer (FWD) testing. <br />Used only by Office of Financial Management for billing and deposit transactions and to record payments to the department for <br />2660 Misc Revenue <br />gravel sold to contractors and others. <br />Miscellaneous maintenance tasks performed on a specific bridge or structure not covered by other source codes. Includes work <br />on items such as stairways, drains, fencing, light bases, transient guards, and access doors. Includes transient removal, ordering <br />2822 Miscellaneous Bridge Maintenance <br />materials, and picking up equipment. Includes related traffic control. <br />On Call Electronic Communications Infrastructure <br />3049 Maintenance To be used by Statewide Radio Communications personnel to record on -call time. <br />Work related to the repair and replacement of overhead sign panels, extruded sign panels mounted on I -beams, and overhead <br />2142 Overhead Sign Panel Maintenance sign structures. Includes related cable locates and traffic control. Does not include structural work. <br />2102 Patching Related source type codes: 2103-Heavy patching, 2104-Bituminous paving, 2105-Blow patching <br />For tasks related to the operation of the pavement management system, including development and maintenance/technical <br />1520 Pavement Management System support. Includes tasks to meet needs external to MnDOT. <br />Shoulder to shoulder snow removal operation, winging back, snow blowing drifts, and the application of de-icing chemicals using <br />2406 Plowing & Material Application mobile equipment. Includes changing cutting edges during event and related traffic control. <br />Use for the repair and preventative maintenance of all equipment associated with wireless two-way radio communications <br />systems (includes mobile radios, portable radios, base stations, console workstations, recorders, etc.). Non-MnDOT equipment - <br />3005 Radio - Mobile Equipment Must use Project number assigned to requesting agency (State Patrol, DNR, BCA, Fire Marshall). See OSRC Project Code list. <br />Creating or modifying radio frequency programs and programming mobile and portable radios. Does not include mobile radios <br />3027 Radio Programming used as fixed base radios as part of the Inter -OP System (Use 3009). <br />Use for the repair and preventative maintenance of all equipment associated with wireless two-way radio communications <br />systems (includes mobile radios, portable radios, base stations, console workstations, recorders, etc.). Non-MnDOT equipment - <br />Must use Project number assigned to requesting agency; Department of Public Safety (DPS) includes State Patrol (SP) Bureau of <br />3002 Radio/Electronic Infrastructure Criminal Apprehension (BCA), Fire Marshall); does not include Department of Natural Resources (DNR). See OSRC Project <br />3007 Radio/Electronic System Engineering Use for design of microwave, radio and miscellaneous electronic systems. <br />Use for the installation and other services needed to provide major system upgrades or improvements to wireless or electronic <br />3009 Radio/Electronic System Upgrade & Installation systems. Use for all work performed to correct or repair deficiencies found in a new installation. <br />Used by Materials and Research Section and district materials staff to verify inspector" sampling and testing procedures and <br />checking inspectors' equipment during project construction as required by FHWA. Use when performing field tests on split <br />1716 Record Sampling sample. <br />Page 3 of 5 <br />