Unit Billing
<br />Schedule of Work Completed
<br />Application: 9
<br />Period. 05/05/2022
<br />Contract Pius
<br />Previous
<br />Current knits
<br />Total Units
<br />Previous
<br />Current
<br />Total
<br />Bid Item Description PricelUnit
<br />Changes
<br />Units Billed
<br />Complete
<br />Complete
<br />Value
<br />Value
<br />Value
<br />Retained
<br />290 Sanitary Clean Out
<br />365.00
<br />365.00
<br />1.00
<br />1.00
<br />365.00
<br />365.00
<br />18.25
<br />300 Reconstruct Sanitary Manhol
<br />1,250.00
<br />1,250.00
<br />1.00
<br />1.00
<br />1,250.00
<br />1,250.00
<br />62.50
<br />310 4" HDPE Service
<br />115.00
<br />10,235.00
<br />89.00
<br />89.00
<br />10,235.00
<br />10,235.00
<br />511.75
<br />320 1" ENDO PE Service
<br />33.00
<br />8,085.00
<br />245.00
<br />245.00
<br />8,085.00
<br />8,085.00
<br />404.25
<br />330 24" Perf HDPE Infiltration Pip
<br />10&00
<br />10,260.00
<br />95.00
<br />95.00
<br />10,260.00
<br />10,260.00
<br />513.00
<br />340 15" PVC Drainage Pipe
<br />89.00
<br />712.00
<br />8.00
<br />8.00
<br />712.00
<br />712.00
<br />35.60
<br />350 Catch Basin with 24" Sump
<br />3,900.00
<br />3,900.00
<br />1.00
<br />1.00
<br />3,900.00
<br />3,900.00
<br />195.00
<br />360 Rain Guardian Turret
<br />3,800.00
<br />19,000.00
<br />370 18" CMP Pipe Culvert
<br />52.00
<br />2,652.00
<br />51.00
<br />51.00
<br />380 12" CMP Pipe Culvert
<br />46.00
<br />5,244.00
<br />114.00
<br />112,00
<br />5,244.00
<br />5,244.00
<br />262.20
<br />105.00
<br />390 18" Metal Safety Apron
<br />1,050.00
<br />2,100.00
<br />2.00
<br />2,100.00
<br />2,100.00
<br />400 1.2" Metal Apron
<br />880.00
<br />6,280.00
<br />6.00
<br />6.00
<br />5,280.00
<br />5,800.00
<br />5,280.00
<br />.
<br />264.00
<br />240.00
<br />410 Type 2 RipRap, Geotex Fabri
<br />160.00
<br />800.00
<br />5.00
<br />5.00
<br />5.00
<br />862.00
<br />800.00
<br />420 Cone Erosion Mat
<br />166.00
<br />1,162.00
<br />7.00
<br />1,000.00
<br />162.00
<br />1,162A0
<br />58.10
<br />50.10
<br />430 3" Sched 40 PVC Sleeving
<br />10.00
<br />1,000.00
<br />100.00
<br />0.00
<br />100.00
<br />1,aD0.00
<br />1,000.00
<br />50.00
<br />431 SECTION 4
<br />440 Bit Pavement Entrance & Par
<br />22.20
<br />160,506.00
<br />3,615.00
<br />3,615.00
<br />8D,253.00
<br />89,000.00
<br />65
<br />4,950.00
<br />450 Bit Trails
<br />16.40
<br />71,110.40
<br />1,158.54
<br />1,158.54
<br />19,000.00
<br />19,a00.a4
<br />95a.00
<br />460 Bit Pickleball Court
<br />30.00
<br />28,770.00
<br />959.00
<br />959-00
<br />28,770.00
<br />28,770.00
<br />1,438,50
<br />470 Reconstruct EAsting Bit Trail
<br />14.00
<br />20,174.00
<br />1,442.00
<br />1,442.00
<br />20,188.00
<br />20,188.00
<br />1,009.40
<br />480 6" Concrete Paving
<br />9.20
<br />214,516A0
<br />2,000.00
<br />2,000.00
<br />18,400.00
<br />18,400.00
<br />920.00
<br />490 18" Wide Concrete Maint Stri
<br />21.70
<br />9,287.60
<br />428.00
<br />428.00
<br />9,287.60
<br />9,287.60
<br />464.38
<br />500 B612 Concrete Curb & Gutter
<br />22.00
<br />71,830.00
<br />3,265.00
<br />3,265.00
<br />71,830.00
<br />71,830.00
<br />3,591.50
<br />510 6" x 18" Concrete Curb wl Wa
<br />17.00
<br />8,636.00
<br />508.00
<br />508.00
<br />8,636.00
<br />8,636.00
<br />431.80
<br />520 6" x 18" Concrete Curb
<br />35.00
<br />10,850.00
<br />310.00
<br />310.00
<br />10,850,00
<br />10,850.00
<br />542.50
<br />530 Lot Striping, Signage, Cross
<br />3,700,00
<br />3,700,00
<br />540 Pickleball Court Color Coatin
<br />550 Truncated Domes wl Ped Ra
<br />7,200.00
<br />55.00
<br />7,200.00
<br />14,960.00
<br />272.00
<br />272.Oa
<br />14,960.00
<br />14,960.00
<br />748A0
<br />551 SECTION 5
<br />560 Drinking Fountain
<br />5,800.00
<br />5,800.00
<br />0.50
<br />0.50
<br />,00.00
<br />2,900.00
<br />185.00
<br />570 Shower Tower
<br />7,400.00
<br />7,400.00
<br />0.50
<br />0.50
<br />3 ,70DAp
<br />3,700.aD
<br />15.a0
<br />Page 3