Laserfiche WebLink
PAY ESTIMATE #2 <br />CITY OF ELK RIVER <br />NATURES EDGE BUSINESS CENTER THIRD ADDITION <br />Base Bid <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNIT <br />CONTRACT <br />UNIT PRICE <br />CONTRACT <br />AMOUNT <br />USED TO <br />DATE <br />EXTENSION <br />1 <br />MOBILIZATION <br />1 <br />LUMP SUM <br />$ 70,400.00 <br />$ 70,400.00 <br />0.75 <br />$ 52,800.00 <br />2 <br />CLEARING <br />10 <br />EACH <br />$ 112,80 <br />$ 1,128.00 <br />10 <br />$ 1,128.00 <br />3 <br />GRUBBING <br />10 <br />EACH <br />$ 75.20 <br />$ 752.00 <br />10 <br />$ 752.00 <br />4 <br />CLEARING <br />2.15 <br />ACRE <br />$ 7,200.00 <br />$ 15,480.00 <br />2.15 <br />$ 15 480.00 <br />5 <br />GRUBBING <br />2.15 <br />ACRE <br />$ 4,800.00 <br />$ 10,320.00 <br />2.15 <br />$ 10,320.00 <br />6 <br />REMOVE CONCRETE APRON <br />1 <br />EACH <br />$ 300.00 <br />$ 300.00 <br />$ <br />7 <br />REMOVE GATE VALVE AND BOX <br />1 <br />EACH <br />$ 400.00 <br />$ 400.00 <br />1 <br />$ 400.00 <br />8 <br />REMOVE HYDRANT <br />1 <br />EACH <br />$ 400.00 <br />$ 400,00 <br />1 <br />$ 400.00 <br />9 <br />REMOVE SIGN <br />1 <br />EACH <br />$ 50.00 <br />$ 50.00 <br />$ <br />10 <br />ISALVAGE SIGN <br />2 <br />EACH <br />$ 50.00 <br />$ 100.00 <br />1 <br />$ 50.00 <br />11 <br />SAWING BITUMINOUS PAVEMENT FULL DEPTH <br />590 <br />LIN FT <br />$ 3.50 <br />$ 2,065.00 <br />$ <br />12 <br />REMOVE WATERMAIN <br />10 <br />LIN FT <br />$ 90.00 <br />$ 900.00 <br />10 <br />$ 900.00 <br />13 <br />REMOVE CONCRETE CURB <br />797 <br />LIN FT <br />$ 3.50 <br />$ 2,789.50 <br />88 <br />$ 308.00 <br />14 <br />REMOVE BITUMINOUS PAVEMENT <br />1,374 <br />SQ YD <br />$ 5.00 <br />$ 6,870.00 <br />$ <br />15 <br />EXCAVATION - COMMON <br />95,211 <br />CU YD <br />$ 1.96 <br />$ 186,613.56 <br />90,211 <br />$ 176,813.56 <br />16 <br />DEWATERING <br />1 <br />LUMP SUM <br />$ 44,000.00 <br />$ 44,000.00 <br />1 <br />$ 44,000.00 <br />17 <br />SUBGRADE SOIL MODIFICATION <br />10,471 <br />SQ YD <br />$ 0.75 <br />$ 7,853.25 <br />$ <br />18 <br />SUBGRADE PREPARATION <br />28.9 <br />ROAD STA <br />$ 600.00 <br />1 $ 17,340.00 <br />$ <br />19 <br />AGGREGATE BASE CLASS 5 - TRAIL CV P <br />495 <br />CU YD <br />$ 35.60 <br />$ 17 622.00 <br />$ <br />20 <br />AGGREGATE BASE CLASS 5 - STREET CV P <br />3,088 <br />CU YD <br />$ 27.00 <br />$ 83,376.00 <br />$ <br />21 <br />MILL BITUMINOUS SURFACE 2.0" <br />124 <br />SQ YD <br />$ 20.00 <br />$ 2,480.00 <br />$ <br />22 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />705 <br />GALLONS <br />$ 3.00 <br />$ 2,115.00 <br />$ <br />23 <br />TYPE SP 12.5 WEARING COURSE MIXTURE 2,6 2.5" THICK <br />2,686 <br />SQ YD <br />$ 13.70 <br />$ 36,798.20 <br />$ <br />24 <br />TYPE SP 12.5 WEARING COURSE MIXTURE 3,8 2.0" THICK <br />10,072 <br />SQ YD <br />$ 8.65 <br />$ 87,122.80 <br />$ <br />25 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE 3 B 2.5" THICK <br />9,948 <br />SQ YD <br />$ 10.30 <br />$ 102 464.40 <br />$ <br />26 <br />15" RC PIPE APRON <br />3 <br />EACH <br />$ 1,040.00 <br />$ 3,120.00 <br />$ <br />27 <br />18" RC PIPE APRON <br />2 <br />EACH <br />$ 1,102.00 <br />$ 2,204.00 <br />$ <br />28 <br />21" RC PIPE APRON <br />1 <br />EACH <br />$ 1,257.00 <br />$ 1,257.00 <br />$ <br />29 <br />42" RC PIPE APRON <br />1 <br />EACH <br />$ 2,682.00 <br />$ 2,682.00 <br />$ <br />30 ITRASH <br />GUARD FOR 15" PIPE APRON <br />3 <br />EACH <br />$ 556.00 <br />$ 1,668.00 <br />$ <br />31 ITRASH <br />GUARD FOR 16" PIPE APRON <br />2 <br />EACH <br />$ 610.00 <br />$ 1,220.00 <br />$ <br />Page 1 ER308 - Pay Estimate <br />