Laserfiche WebLink
Unit Billing Application: 7 <br />Period: 12/20/2021 <br />Schedule of Work Completed <br />Total Contract <br />Previous <br />Current Units <br />Total Units <br />Previous <br />Current <br />Total <br />Bid Ite Description <br />Price <br />Unit <br />Units <br />Units Billed <br />Complete <br />Complete <br />Value <br />Value <br />Value <br />600 Volleyball Net, Posts, Footings <br />2,500.00 <br />EA <br />2.0000 <br />2.00 <br />2.00 <br />5,000.00 <br />5,000.00 <br />610 Pickleball Net, Posts, Footings <br />2,750.00 <br />EA <br />4.0000 <br />620 4' Chain Link Fence Ind Concret <br />36.22 <br />LF <br />132,0000 <br />132.00 <br />132.00 <br />4,781.04 <br />4,781.04 <br />630 10' Fence, Gates, Footings - Pickl <br />55.20 <br />LF <br />404.0000 <br />404.00 <br />404.00 <br />22,300.80 <br />22,300.80 <br />640 Bike Loops <br />486.00 <br />EA <br />4.0000 <br />2.00 <br />2.00 <br />972.00 <br />972.00 <br />650 Limestone Block Seating <br />436.00 <br />LF <br />147.0000 <br />147.00 <br />147.00 <br />64,092.00 <br />64,092.00 <br />660 Metal Handrail <br />126.00 <br />LF <br />214.0000 <br />661 SECTION 6 <br />670 Turf Seed Mix <br />3,000.00 <br />Acre <br />5.9000 <br />680 Decidious Trees 2" B&B <br />470.00 <br />EA <br />36.0000 <br />15.00 <br />15.00 <br />7,050.00 <br />7,050.00 <br />690 Understory Tree 1.5" B&B <br />440.00 <br />EA <br />3.0000 <br />2.00 <br />2.00 <br />880.00 <br />880.00 <br />700 #5 Shrubs <br />94.00 <br />EA <br />277.0000 <br />710 #1 Perennials <br />30.00 <br />EA <br />136.0000 <br />720 Metal Edging <br />9.00 <br />LF <br />148.0000 <br />721 SECTION 7 <br />730 Lighting Unit - Single Fixture <br />3,550.00 <br />EA <br />13.0000 <br />13.00 <br />13.00 <br />46,150.00 <br />46,150.00 <br />740 Lighting Unit - Double Fixture <br />1,800.00 <br />EA <br />1.0000 <br />1.00 <br />1.00 <br />1,800.00 <br />1,800.00 <br />760 Concrete Light Base Foundation <br />1,320.00 <br />EA <br />14,0000 <br />14.00 <br />14.00 <br />18,480.00 <br />18,480.00 <br />770 1"Non-Metallic Conduit <br />3.00 <br />LF <br />2,170.0000 <br />2,170.00 <br />2,170.00 <br />6,510.00 <br />6,510.00 <br />780 2" non -Metallic Conduit <br />4.70 <br />LF <br />350.0000 <br />350.00 <br />350.00 <br />1,645.00 <br />1,645.00 <br />790 #1 Use Wire <br />4.40 <br />LF <br />126.0000 <br />126.00 <br />126.00 <br />554.40 <br />554.40 <br />800 #2 Use Wire <br />5.50 <br />LF <br />126.0000 <br />126.00 <br />126.00 <br />693.00 <br />693.00 <br />810 IP & 2P Breakers <br />16.50 <br />EA <br />6.0000 <br />6.00 <br />6.00 <br />99.00 <br />99.00 <br />920 #8 Use Wire <br />2.75 <br />LF <br />2,308.0000 <br />2,308.00 <br />2,308.00 <br />6,347.00 <br />6,347.00 <br />930 #10 Use Wire <br />2.20 <br />LF <br />4,668.0000 <br />4,668,00 <br />4,668.00 <br />10,269.60 <br />10,269.60 <br />940 Lighting System - Volleyball Area <br />16,000.00 <br />LS <br />1.0000 <br />1.00 <br />1.00 <br />16,000.00 <br />16,000.00 <br />950 3" HDPE Conduit <br />6.70 <br />LF <br />675.0000 <br />675.00 <br />675.00 <br />4,522.50 <br />4,522.50 <br />960 V HDPE Conduit <br />3.10 <br />LF <br />675.0000 <br />675.00 <br />675.00 <br />2.092.50 <br />2,092.50 <br />970 16'x16" Quartzite Handhole <br />310.00 <br />EA <br />1.0000 <br />1.00 <br />1.00 <br />310.00 <br />310.00 <br />980 24"x24' Quartzite Vault <br />500.00 <br />EA <br />3.0000 <br />3.00 <br />3.00 <br />1,500.00 <br />1,500.00 <br />990 16"x16"x6" NEMA 3R Enclosure <br />150.00 <br />EA <br />1.0000 <br />1.00 <br />1.00 <br />150.00 <br />150.00 <br />991 SECTION 8 -ADD'L WORK <br />Page 4 <br />