My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5.4 ERMUSR 05-10-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2022
>
05-10-2022
>
5.4 ERMUSR 05-10-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 11:48:26 AM
Creation date
5/12/2022 11:48:26 AM
Metadata
Fields
Template:
City Government
type
ERMUSR
date
5/10/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Detailed Findings <br /> <br />Satisfaction Indicators <br />Reliability of ERMUEase of doing business with ERMU <br />satisfaction measures, at 6.0 out of a possible 1 to 7 score, where 7 is completely satisfied. A close <br />second was satisfaction with ERMU overall, at 6.9. These are high scores. The lowest satisfaction <br /> <br /> <br />The factors measured were: <br />1.Ease of doing business with ERMU <br />2.Reliability of the power, water and other services you receive from ERMU <br />3.efforts to be environmentally friendly <br />4. <br />5.ERMU as my utility provider overall <br /> <br />The graph below shows the values for Q1 2022. <br /> <br />Satisfaction with ERMU <br />(1 is completely dissatisfied; 7 is completely satisfied) <br />Q1, 2022 <br />The ease of doing business with ERMU <br />6.0 <br />The reliability of the power, water and other services <br />6.0 <br />ERMU's efforts to be environmentally friendly <br />5.7 <br />ERMU's efficiency rebate programs <br />5.4 <br />ERMU as my utility provider overall <br />5.9 <br />Q1, 2022 <br /> <br /> <br />5 <br /> <br />98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.