My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.4 ERMUSR 05-10-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Utilities Commission
>
Packets
>
2014-2024
>
2022
>
05-10-2022
>
2.4 ERMUSR 05-10-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 11:19:55 AM
Creation date
5/12/2022 11:18:03 AM
Metadata
Fields
Template:
City Government
type
ERMUAG
date
5/10/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE 2 – WHOLESALE SUPPLY RATES <br /> <br />Interconnection Process: In order to provide for coordinated interconnection of <br />customer-owned distributed energy resources and comply with Minnesota Statutes <br />Section 216B.1611, subd. 3(2), Utility has adopted the “Minnesota Municipal <br />Interconnection Process (M-MIP) 2022” as recognized by the Minnesota Municipal <br />Utilities Association Board of Directors at its February 9, 2022, meeting and made <br />publicly available at mmua.org. <br />General technical requirements may be found in the Minnesota Technical <br />Interconnection and Interoperability Requirements (TIIR) as adopted by the Minnesota <br />Public Utilities Commission on January 22, 2020as part of DOCKET NO. E-999/CI-16- <br />521. <br />For utility-specific safety standards, required operating procedures for interconnected <br />operations, and the functions to be performed by any control and protective apparatus, <br />please contact Utility for its Technical Specifications Manual (TSM). <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.