Laserfiche WebLink
BECK LAW OFFICE <br />4746 Sheridan Ave. S. <br />Minneapolis, MN 55410 <br />Timothy Wold <br />SRF Consulting Group, Inc. <br />2701 W Wayzata Blvd, Suite 100 <br />Minneapolis, MN 55416 <br />Peter K Beck <br />Attorney at Law <br />May 6, 2022 <br />Re: Orono Park Pickleball Courts <br />Dear Mr. Wold: <br />612-991-1350 <br />peter@peterbeoMaw.com <br />VIA U.S MAIL <br />This letter is written on behalf of my client the City of Elk River ("City"). On April 20, <br />2020, the City entered into a Standard Agreement for Professional Services ("Agreement") with <br />SRF Consulting Group, Inc. ("SRF") to provide the professional services described in SRF's <br />April 4, 2020, proposal to the City for Active Park Improvements for Orono Park and the City's <br />Youth Activity Complex. Included in the services to be provided by SRF is the design of four (4) <br />pickleball courts at Orono Park. As you are aware, SRF designed the pickleball courts with a <br />1.25% slope, draining from east to west, with a crown between courts 1 and 2. New Look <br />Construction, the contractor, subsequently installed the pickleball courts with a crown that has an <br />approximately 1.4% slope. <br />The American Sports Building Association Pickleball Court Construction and <br />Maintenance Manual, 2020 Edition ("Manual"), provides that pickleball court surfaces should <br />slope between 0.83% (1:120) and 1.00% (1:100), and should be sloped in one plane in the shortest <br />direction. The 1.25% slope that SRF designed for the Orono Park pickleball courts exceeds this <br />standard by 25%, and the east -west drainage pattern with the crown between courts 1 and 2 is <br />contrary to the Manual standard that drainage be sloped in one plane in the shortest direction. <br />These two design defects need to be corrected, and the only way to do so is by removing all of the <br />existing bituminous pavement and concrete maintenance strip, regrading the courts, and replacing <br />the bituminous surface and concrete maintenance strip. <br />In a letter to Michael Hecker, Elk River Parks and Recreation Director, dated October 20, <br />2021, you proposed that SRF would address the design defects by paying for the cost of removing <br />and replacing the concrete maintenance strip, removing the existing bituminous surface and <br />installing a base lift of bituminous, all for a total amount of $21,119. You further suggested the <br />City bear the cost of revising the drainage pattern from east -west to north -south by paying for the <br />regrading, including additional class five base; and that the contractor bear the cost of repaving <br />because of the construction defect that resulted in an approximately 1.4% slope at the crown. <br />