My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4.1. DRAFT PC MINUTES 04-26-2022
ElkRiver
>
City Government
>
Boards and Commissions
>
Planning Commission
>
Planning Packets
>
2021-2030
>
2022
>
04-26-2022
>
4.1. DRAFT PC MINUTES 04-26-2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 9:28:47 AM
Creation date
4/22/2022 9:28:36 AM
Metadata
Fields
Template:
City Government
type
PCSR
date
4/26/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning Commission Page 8 <br /> March 22,2022 <br /> ----------------------------- <br /> 7.1. Vinje Investments, LLC — 16807 US Highway 10; 75-011-2401 and 75- <br /> 011-3203 <br /> ■ Concept Review: Mini-Storage, Outdoor Storage, and Light Industrial, Case <br /> No. CR 22-02 <br /> Mr. Carlton presented the staff report. Mr. Vinje's consultant and architect, Paul <br /> Kangas,was available via Zoom. <br /> Mr. Carlton explained the area would require a zone change and possible <br /> comprehensive plan amendment as ministorage is not a permitted use in the <br /> current zoning district. He discussed the wetlands and a natural gas line easement <br /> which will limit some parcels and what can be developed on them. He stated this <br /> area has challenges but also some strengths. Mr. Carlton stated the west side of <br /> US Highway 10 is geared for a frontage road, but the east sid ;, f the highway is <br /> still very much unknown. <br /> Mr. Vinje indicated he was interested in oAe"fingghe parcel with the white house, <br /> which has highway access, to the city for a possible land exchange,but because <br /> MnDOT is still working on future plans the city will not proceed with an <br /> exchange until MnDOT'S plans are finalized.Mr.Vinje indicated he may sell that <br /> parcel because he does not want to wait that long. He also discussed the <br /> billboard parcel and how his decisions are highly de.,e?adent on what MnDOT <br /> proposes for the US Highway 10 interchan e <br /> Commissioner Johnson'commentedhe would supporf°the use of the ministorage <br /> and outdoor storage concept. He asked questions about MnDOT closing access <br /> to the highway as seen in other highway improvement project. <br /> Mr. Carlton stated it is helpful to plan for a future interchange,but the location <br /> of the interchange is still up in the air. He noted MnDOT will look to do what <br /> ,best fits the site and the timeline is unknown. <br /> ,"Chair Larson-Vito stated she was in favor of accepting this layout in the FAST- <br /> zoning district with light industrial near the highway and mini-storage in the rear <br /> of the parcel, so the visual entrance to the city is more attractive. She would like <br /> the outdoor storage to be screened by the mini-storage buildings. <br /> Commissioner Booth asked questions regarding the existing wetlands and where <br /> the stormwater will go. <br /> Mr. Vinje explained he is completing a wetland delineation process and will learn <br /> what types of wetlands are present,any impact on his proposed project, and the <br /> cost of filling in some wetlands should he wish to purchase wetland credits. He <br /> indicated the area is about 1.3 to 1.5 acres of wetland at an approximate cost of <br /> $150,000 to fill and would prefer to leave the wetlands alone,if possible, to avoid <br /> additional costs. <br /> 111`41AWRE <br /> . . .. . . . . . . <br />
The URL can be used to link to this page
Your browser does not support the video tag.